Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Compiled Approved Plans OPW17/0561.01

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                     Australian Tree Contractors & Arboricultural Consultants Pty Ltd

P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au

occur within the SRZ and suitable plant sizes are to be installed to limit any root
damage within the SRZ.
The PA will review the Landscape plant selection to ensure suitable plants are
installed in this area of the development, specifically in the TPZ and above the lift
access tunnel. To view this landscape plan, use the supplied link below.
https://1drv.ms/b/s!AqwJKyWitm0GtRNX7X0ImJLL19Vs
Tree Protection Methodology as Per AS4970-2009
Tree Protection Methodology for Tree 28

General: A nominal Tree Protection Zone (TPZ - Australian Standard for Protection
of Trees on Development Sites AS 4970 -2009) During Excavation, approach the
TPZ with care. Roots should be exposed undamaged where possible. Roots that are
encountered, that will intrude or interfere, should be cut. Tearing, pulling or stripping
roots is to be avoided and roots are to be cut to the minimum edge of the excavation.
       1.1.1. Works (including removal of surfaces, paving of other, that will intrude
                 further into the TPZ must be attended by the PA (or delegate) who
                 will approve a method that will minimise impacting damage.
       1.1.2. Surface levels within the area of the TPZ must not be altered, raised
                 or lowered, without the expressed approval of the PA who may make
                 binding recommendations to minimise impact.
       1.1.3. WATER: Exposed roots can dry out, cease to function and die. Newly
                 exposed areas from demolished structures or paved surfaces.
                 exposed edges of trenches adjacent to the TPZ and Exposed roots
                 should be both protected against and compensated for water loss; a
                 curtain covering the exposed edge and an addition of water to the
                 TPZ area should be included in the operations plan. A suggested
                 quantity of no less than 1000 litres twice per week would be required
                 during works until completion. Recycled water is not recommended
   1.2. Canopy: Scalding by exhaust from machinery has shown not to be a major
          concern for the machines used to date. This may not always be the case
          and discharge of exhaust for prolonged periods (more than 3 to 4 minutes)
          should be avoided until the potential impact can be assessed in more
          detail.;
   1.3.
       1.3.1. Reduce recurring need of future pruning and
       1.3.2. minimise the impact on the canopy form.
   1.4. Contact with leaves and branches during works should be avoided; In the
          unfortunate instance where contact has occurred and caused damage, the
          PA should be notified ASAP to establish mitigating action.


 “We manage the trees that you care about and remove the trees you worry about”

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW17_0561.01.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.