Council archive · source document
Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
Australian Tree Contractors & Arboricultural Consultants Pty Ltd
P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au
prior, during and after any
storm events.
Irregular root zone
(exposed roots
Prolonged Project Canopy colour and form Arboricultural
heavy rain Arborist Rootzone treatment
Mulch
Fire or Project Mulch and rootzone Arboricultural
vandalism Arborist Canopy assessment and
treatment
Prolonged Project Canopy health Watering regime
drought (less Arborist Form and growth Arboricultural
than 50mm Soil moisture (to 400mm water thrift strategy
rain 2 months) min)
Immediately Project Tree health and vigour
after Arborist Tree condition Continuing
construction Protected area integrity maintenance
Site resources for strategy
maintenance
Every 2 years Project Continued inspections at Maintenance
after Arborist intervals agreed by all assessment and
commissioning interested parties or strategy
project agency’s in consultation
with the PA
“We manage the trees that you care about and remove the trees you worry about”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.