Council archive · source document
Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
Australian Tree Contractors & Arboricultural Consultants Pty Ltd
P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au
TREE PROTECTION GUIDELINES
(Created in consideration of Australian Standard 4970-2009)
1. The following requires that a Project Arborist (PA) be nominated for the duration
of construction work.
2. Once worked areas and protection zones have been established, the required
access should be planned and marked. A subsequent inspection should
determine the root area to be affected and estimate the relevant impact to any
potentially damaged roots.
3. There shall be no significant planting within the SRZ and any plants that are to be
installed in this zone should only be of tube stock and be hand dug in with no
tools used at all.
4. As this site has a 32-degree slope bunting must be installed up the slope at the
TPZ outer perimeter to prevent any potential soil incursion into the TPZ while the
excavation from within the grout piles occurs and that this dust issue be mitigated
to prevent foliage coverage on Tree 28. This same protocol is relevant and needs
to action when the material is backfilled later.
5. Pursuant to the above, mitigation strategies should be decided and invoked
including:
5.1. Nominated access past the tree 28 that can ensure that the tree 28 will be
protected from damage or any uncontrolled interference.
5.2. Designation of a protection zone for tree 28 that will not be accessible
during construction for anything other than tree related operations and only
by authorized persons.
5.3. All weight reduction pruning will be done be done by suitably qualified a
Project Arborist and works should meet or exceed Australian Pruning
Standard 4373-2007.
5.4. Inspection at prescribed intervals ATCAC’s AQF Level 5 PA Arborist
familiar with the history and the planned works. The intervals are:
5.5. During construction (see 4 below), no less frequently than monthly and or if
any of the Tree Inspection Triggers are instigated.
5.6. After the commission of the property concerned, including relevant written
Arboricultural comments. This will assist in future maintenance.
6. During construction, regular inspection should be made of protective fencing and
site compliance with requirements;
7. The PA should be notified immediately after an encounter has occurred that has
or may cause damage to the trees, (including vandalism) or when any activity or
operation is planned that will intrude the protection zone.
8. Necessary continuing trespass over the root zone will require the construction of
a suspended slab or bridge or compaction reduction strategy for the traffic areas
affecting critical roots as identified by the Project Arborist. The strategy should
dissipate any contact with the root zone and allow the flow of air and water to the
soil.
9. At the discretion of the PA, the full area inside the TPZ should be maintained and,
“We manage the trees that you care about and remove the trees you worry about”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.