Compiled Approved Plans OPW17/0561.01

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                     Australian Tree Contractors & Arboricultural Consultants Pty Ltd

P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au

   where appropriate, mulched to a depth of no less than 70mm with composted
   forest mulch or equivalent.

1. TREE PROTECTION ZONES (TPZ) For Tree 28
The following is compiled in consideration of the Australian Standard AS 4970-2009

   1.1. The protection zone is created with the understanding that no activity outside
        the protection zone will affect water movement or drainage into, out of or
        within the TPZ.
   1.2. The TPZ is defined for tree 28 at a radius of 6.46m.

2. PROTECTIVE FENCING:
   2.1. Due to site restrictions a suitable barrier mesh needs to be installed.
   2.2. The fence should be signed with a sign no less than 300mmx300mm stating
        to the effect the following:
                                     ” Tree Protection Zone
                   This fence must not be: altered, trespassed or removed
                      without the expressed authority of the site manager
                                   and/or the Project Arborist.”
   2.3. Once erected, protective fencing must not be removed or altered without
        approval by the project arborist.
   2.4. The TPZ should be clarified to all contractors and subcontractors that this is
        a no-go zone
   2.5. Fence posts and supports should have a diameter greater than 30 mm and
        be located clear of roots.
   2.6. Consideration of any activity that involves the TPZ must be made with the
        input of the Project Arborist.

3 ACTIVITIES RESTRICTED WITHIN THE TPZ

Activities generally excluded from the TPZ include but are not limited to:
    • Machine excavation including                • Wash down and cleaning of
         trenching;                                   equipment;
    • Excavation for silt fencing;                • Placement of fill;
    • Cultivation;                                • Lighting of fires;
    • Storage;                                    • Soil level changes;
    • Preparation of chemicals,                   • Temporary or permanent
         including preparation of cement              installation of utilities and signs,
         products;                                    and
    • Parking of vehicles and plant;              • Physical damage to the tree.
    • Refuelling;                                 • Trespass or passage of
    • Dumping of waste;                               persons vehicles or vehicles.



 “We manage the trees that you care about and remove the trees you worry about”

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW17_0561.01.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.