     REMOVAL OF BUILDING WASTE

          Building waste will be collected in a garbage trailer or light truck situated
          adjacent to the garage of No. 10 Park Road. Sand spoil will be lowered
          daily from the terrace platform to the garbage trailer or light truck located
          adjacent to the garage of No.10 Park Road.

     EROSION AND SEDIMENT CONTROL

          Erosion and Sediment Control is considered for both work areas as
          summarized below:
             □ The driveway to park Road will require silt fences to be installed to
                the perimeter of the works. Sand bags will be placed in the gutters
                during excavation and concreting to prevent runoff into the Council
                storm water system.
             □ Erosion and Sediment Control for the proposed terrace will
                require a silt fence to the perimeter of the proposed footing
                excavation.
             □ The permanent storm water drainage system will be connected
                to the Council system as an early works operation to prevent
                any concentrations of runoff discharging onto the sand slope.

     Environmental Controls Plan to prevent pollution from
     concreting operations during the construction (Grouting & Pile
     Caps)

     Background.

     The use of concrete materials is reduced to a minimum due to the use of
     a micro piling system which is to be craned onto site.
     The small volumes of concrete required allow the use of a small
     concrete grout pump with reduced line size to grout piles and concrete
     pile caps.
     This system gives precise control to the operators making spillage and
     cleaning requirements negligible.


       “We manage the trees that you care about and remove the trees you worry about”

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW17_0561.01.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.