       Controls:
       The builder/site manager will ensure the following best practice sediment
       control measures including a designated wash down area is in place
       before work starts and are adequately maintained throughout construction.

   •    The designated wash down area is to be located within the site on the
        existing paved driveway with sediment control screening in place and
        an appropriate HDP waste receptacle drum will be available to retain
        any sediment waste from swept up spillage or cleaning of equipment.

   •    The receptacle drum will be exchanged as required, fitted with a sealed
        lid and the contents removed from site regularly to the concrete
        supplier’s authorised off-site recycling and disposal facility.

   •    The builder/site manager will ensure all workers on the site are aware of
        their responsibilities to minimise pollution including the concrete pump
        operator who will directly monitor equipment to ensure leakage and spillage
        does not occur.
   •    The concrete supplier will be selected on the basis that appropriate
        training has been provided to their agitator truck drivers, and that they
        provide appropriate details and resources to enable them to complete a
        delivery without causing pollution.

   •    The agitator truck driver who will be required to be familiar with the
        Concrete Safe Site Delivery Guidelines (available from Cement Concrete &
        Aggregates Australia at www.concrete.net.au under ‘A-Z Directory’) and will
        have sufficient training and experience to deliver concrete to site and then
        return to the batch plant without causing environmental harm through
        spillage or leakage of concrete.

   •    The driver will always inspect and maintain the truck and will be instructed to
        raise any concerns about the pollution controls on site with the builder/site
        manager.



        “We manage the trees that you care about and remove the trees you worry about”

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW17_0561.01.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.