Australian Tree Contractors & Arboricultural Consultants Pty Ltd
P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au
The piles are grouted as the work proceeds and any excess grout is
collected and pumped into storage containment for offsite disposal in
accordance with the concreting operations environmental protection
plan.
The process is repeated for subsequent piles.
The onsite grouting pump will be contained within its own bunded area
which will be kept clean as the work proceeds and managed in
accordance with the above Environmental Controls Plan to prevent
pollution from concreting operations during the construction.
Pile capping is to be managed in the same way as the grouting
procedures.
“We manage the trees that you care about and remove the trees you worry about”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.