                     Australian Tree Contractors & Arboricultural Consultants Pty Ltd

P O Box 1411, Noosaville DC Queensland 4566.
Mobile: 0431586371
Email: [email protected]
Web: www.australianconsultarborist.com.au

                      suspended solids being recycled back into the plant.


   •    The vehicle will be washed down at the depot.

   •    Delivery vehicles will always be on paved surfaces and so no mud soil and
        or stones will be carried off site as pollutants.
   •    Inspect roads for any sediment that has been tracked off site and
        sweep it back on site.
   •    (This will be done if there is threat of rain and at the end of each day). A hose will
        not be used to wash it away.



       INSTALLATION OF PILES AND CAPPING
       Methodology for installation of hollow bar micro piles as deep foundation
       support for the new timber deck.

           The micro piles consist of one or more outers steel casings installed to
           the depths indicated on the piling subcontractor (PCA) drawings. A
           central steel reinforcing element consisting of a 40/20 hollow bar is to
           extend to a pre- determined design depth below the casing to form the
           bond length and develop the applied load.
           After checking the project drawings for the details of the micro pile
           arrangement for each pile location (designed in accordance with the Tree
           protection plan.) the Tree protection plan, the construction management
           plan and relevant environmental protection documentation and
           instructions the rig will be craned into position for the first pile onto a
           previously established level temporary protective platform constructed in
           accordance with the tree protection plan and AS4970 - 2009.

           Drilling will be carried out using a 90mm EXX drill bit using a rotary top
           hammer for installation and all installation specifications accurately
           recorded for this and all subsequent piles.


        “We manage the trees that you care about and remove the trees you worry about”

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW17_0561.01.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.