4970 to minimize foot traffic on the slope and compaction of soils
when relocating equipment.
Building waste will be collected and removed daily in a garbage trailer or
light truck located adjacent to the garage of No.10 Park Road. In order to
minimize waste and hence its removal, most building materials will be
pre- engineered and delivered to site pre-cut to the appropriate size.
Deliveries will be by light truck (6T) in small loads which will be
manhandled to site
At this stage it is envisaged that the following elements will be pre-
engineered prior to delivery:
• Micro piles
• Reinforcing steel for footings
• Structural steel posts and bearers
• Timber joists and flooring
• Scaffolding support
Amendment 3.
The proposed lift components will be pre-fabricated and delivered in flatpack form to a rented
warehouse in the Noosaville Industrial estate. The components will then be transferred to site as
required. Deliveries will be by light truck (6T) in small loads which will be manhandled when on site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.