CONSTRUCTION PROGRAM
The proposed Construction Program is summarized below:
Operation Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
Site Establishment
#
New Access Path
#
Construct Working Platform
#
Install Micro Piles
#
Construct Pipe Caps
#
Erect Scaffolding
#
Construct steel columns and
bearers together with timber #
joists and decking to terrace.
Install Stormwater Reticulation
#
Install Landscaping
#