Council archive · source document
Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
Amendment 6: 1. a. No further works, machinery or storage of materials will be located within the undeveloped portion of the Tree Protection Zone of Tree 28, the Endiandra sieberi (Corkwood), located immediately north of the proposed lift access walkway entrance. b. Recommendations laid out in AS4970-2009 Protection of trees on development sites will be adhered to throughout the remaining build under the supervision of and certification by the project arborist Kurt Brown. c. A Tree Protection Zone as per AS4970 requirements will be established. d. Tree 28, the Endiandra sieberi (Corkwood), will be monitored and protected from construction activities in accordance with the approval conditions noted in this revised construction management plan and the existing operational works approval updated to include the following: i. an advanced arboriculture inspection of the root plate and collar in accordance with the ISA Tree Risk Assessment procedure will be undertaken by project arborist Kurt brown in the company of Council’s delegate. The permit applicant will meet the reasonable cost of Council’s delegate attending the inspection. ii. landscaping works within the tree protection zone will be undertaken under the direction of the Project Arborist Kurt Brown. 2. Install 350-4500 grout piles with micro pile to a minimum depth of 1.5m below tunnel floor and lift over run. 3. Build concrete capping beam 500mm deep x 800mm wide and install concrete beam (SB) to span between tunnel walls. 4. Excavate down 2.5 m maximum at end of tunnel/ lift shaft using a 1.5t mini excavator established between the rows of grout piles directly above the area to be excavated. The excavated material to be loaded directly onto portable soil conveyors installed downslope of the excavator to covey the material to the area previously excavated for the terrace deck. Sufficient material to be retained at this level to back fill over tunnel slab to level of existing adjacent ground slope. 5. Surplus excavated material to be disposed of in the same manner as the previously excavated terrace deck using a series of soil conveyors supported by the existing scaffold platforms, directly to a light truck situated adjacent to the garage of No. 10 Park Road and removed from site in small loads as work proceeds. 6. Install temporary steel "UC" Shoring after grouting and waterproofing behind horizontal whaler. 7. Excavate further 2.5 m maximum at end of tunnel / lift shaft and install temporary steel "UC" Shoring and repeat until excavation reaches the lift overrun. 8. Construct lift base footing and tunnel base footing after installing steel reinforcing and starter bars for the walls 9. Spray first shotcrete wall to give flat surface after water blasting grout piles, Install waterproofing membrane. 10. Install steel reinforcement to walls and Shotcrete walls up to underside of tunnel slab (Use 40mpa Concrete) 11. Construct tunnel slab and install waterproofing protection and drainage. 12. Install steel reinforcement to remaining walls and Shotcrete up to underside of capping beam
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.