Council archive · source document
Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
leaving starter bars for block work lift shaft. (Use 40mpa Concrete) 13. Build blockwork lift shaft to roof level and cut out and repair 150 UC struts 14. Construct Block Balustrade to Tunnel 15. Back fill over tunnel slab and landscape to level of existing adjacent ground slope reusing sand retained from excavations conveyed to backfilled area reversing the system used for excavation. The Sand is retained by the previously installed shotcrete piers, pier caps and tunnel balustrade. Sand to be placed in 300mm layers watered in and compacted with a plate vibrator as work proceeds returning the soil to existing compaction levels maximizing slope stability. Long term slope stability will be maintained by the establishment of trees and shrubs in accordance with the Myles Baldwin Design report listed in the decision notice and updated Myles Baldwin Landscaping plan which has been revised for compliance with the approval conditions. 16. Install rock face over blockwork lift shaft and tunnel. 17. Install lift and concrete roof over lift shaft. 18. The works shall be landscaped generally in accordance with the Myles Baldwin Design report listed in the decision notice and updated Myles Baldwin Landscaping plan which has been revised to include the following information specifically required in the of the approval conditions. a. Details of local native tree and understory species to be installed to the site including upslope of Tree 28, the Endiandra sieberi (Corkwood) and over the access tunnel. b. Methods to be engaged in the establishment and maintenance of the required landscaping in conjunction with any arborists recommendations. c. Details of reinstatement of the soils to the roof of the access tunnel and methods to ensure slope stability in both short-term and long term. (Also see Item 15 above and the included Slope stability certification) d. Landscaping details to ensure the development is visually screened with vegetation when viewed from Main Beach by maintaining and enhancing the existing canopy structure. A copy of the revised landscaping plan is attached along with this revised construction management plan in order to include as a revision of the existing operational works approval.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.