SLOPE STABILITY CERTIFICATION – PROPOSED LIFT SHAFT
12 PARK ROAD, NOOSA HEADS
Dear Max,
Introduction
This letter provides slope stability certification for a proposed lift shaft at the above site. At the time of writing
construction works were in progress but the proposed lift shaft had not been constructed.
Noosa Council require a slope stability assessment (and certification) for a temporary micropile retention
system, for the proposed lift shaft. Councils Decision Notice (ref. 132003221152.6) includes the following
condition:
45 Prior to the commencement of the proposed building extensions, a registered geotechnical engineer
shall certify the design and construction methods of the foundations taking into consideration the depth and
the details of the foundations of the existing house and identifying any necessary measures required to protect
the stability of the house and the sand dune during the construction phase.
Background Information
The following documentation was provided to us to conduct our review and assessment:
Tectonic Report (16072-001-Rev0)
Structural Drawings prepared by TOD Engineers (Dwgs 1753-S201 to S207)
Temporary retention design drawings prepared by PCA (Dwgs P11544-P101 and P102)
WALLAP analysis files (undertaken by PCA)
Lift Construction Procedure Plan prepared by TOD Engineers.
The piles were designed (using WALLAP) and installed by PCA in March 2018. The micropiles were installed
in accordance with PCA drawings 11544 P101A and P102A prior to our site visit in August 2018.
In addition to the piles installed to support the lift shaft a series of vertical and raked micropiles had been
installed downslope to support a new timber deck.
Analysis
A slope stability report for the site was undertaken by Tectonic in 2016 (refer Report 16072-001-Rev0, dated
April 2016). That report concluded that the site was suitable for the new deck (subject to a number of
recommendations).
A walkover of the site was undertaken by a Director/Principal Engineer (Mr Geoff Hurley) with the Principal
Contractor (Mr Max Bartho) on 21 August 2018. We have also reviewed the documents listed above under
‘Background Information’. Site conditions at the time of our site visit are shown in Photographs 1 to 3.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.