Council archive · source document
Planning Report · MCU20/0143
5.4.2 EARTHWORKS CODE
Performance Outcome Acceptable Outcome Response
Sloping sites AO9 Please refer to Earthworks and
PO9 Cut or fill is less than 1.5 Piling Plan and Site Silt and
On sloping sites development metres in depth relative to the Sediment Erosion Plan prepared
follows the natural landform natural g
round level. by SCG Consulting Engineers.
wherever practical and
excavation or filling is minimal.
5.4.3 LANDSCAPING CODE
Performance Outcome Acceptable Outcome Response
Safety and security AO5.5 The proposed front fence is
PO5 Front fences are no more than setback 2.67m from the site
Landscaping is designed and 1.2 metres high or 1.8 metres if frontage however proposes a
located to maximise the safety at least 50% transparent solid wall of 5.79m and 1.5m of
and security of public and transparent fencing. Despite this,
private areas by— the proposal is considered
1. clearly defining the compliant with PO5 as follows:-
boundaries between
private and public ● A 2.67m landscape strip is
spaces; proposed in front of the
2. promoting casual proposed fencing and
surveillance of buildings provides a clear
and public areas from delineation between
the street and other private and public spaces;
public areas for personal ● Due to the sloping nature
security reasons; of the site, the front fence
does not obstruct casual
3. avoiding concealment surveillance opportunities
spots; to the street frontage
4. maintaining safe sight whilst providing security to
distances to and from residents;
road and b uilding ● As per the Landscape
corners, car p ark OPW Plans, low shrubs are
entrances and proposed along the
driveways; frontage which seeks to
5. maintain safe sight avoid concealment spots,
distances at planting maintain safe sight
bed ends within car distances and ensure
parks; vegetation does not inhibit
6. designing to discourage the effectiveness of street
graffiti; lighting;
● The deep landscape strip
7. ensuring vegetation along the site frontage
does not inhibit the assists in discouraging
effectiveness of street graffiti;
lighting or conceal ● Landscaping is provided to
signage; and assist in directing visitors
8. separating and defining to the entry gate.
pedestrian and vehicle
circulation routes.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 788 KB (small file)
- File type
No other editions are linked here.