Council archive · source document
Planning Report · MCU20/0143
5.4.4 SUSTAINABLE BUILDING DESIGN CODE
Performance Outcome Acceptable Outcome Response
PO2 AO2.1 Please refer to Engineering OPW
Development maximises water If for accommodation activities, Plans. Rain water storage can be
efficiency on site by a minimum 3,000 litres of rain conditioned as part of the
incorporating rainwater water storage is provided per approval.
collection and reuse measures dwelling and reused for
for non-potable purposes such non-potable purposes and
as irrigation. incorporated into a stormwater
management plan for the
development.
5.5 PLANNING SCHEME OVERLAYS
The subject site is not affected by any overlays in accordance with Noosa’s Interactive Mapping.
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 788 KB (small file)
- File type
No other editions are linked here.