                                                                                                                                                Callaghan & Toth



                                                                DOCUMENT HISTORY

Document Reference:                                            No: 2035_Flood.doc

Project Manager:                                               Max Watterson

Author:                                                        Denis Ogle BE (CIVIL)

Reviewer:                                                       Lex Toth RPEQ (ENV) (CIVIL) RPEQ 6069 CPESC

Client:                                                        Vantralia Pty Ltd

Contact Person:                                                Darren Matthews



DISTRIBUTION LIST

                                                                     POSITION ON
          NAME                     ORGANIZATION                                                       REVISION           REVISION               REVISION
                                                                  MANAGEMENT TEAM
                                                                                                         0                  1                      2
    Darren Matthews                Vantralia Pty Ltd                        Client                         1

                                                                   Environmental / Civil
       Lex Toth                    Callaghan & Toth                                                        1
                                                                        Engineers

                                    Noosa Council                   Assessment Officer                     1

    Max Watterson              Max Watterson & Assoc                       Surveyor                        1




REVISION LIST

           REVISION                            DATE DISTRIBUTED                                ISSUED BY                            CHECKED BY

                 0                                8th Sept 2020                                     DO                                   LT



                  The information contained in this report is confidential and proprietary to Callaghan and Toth. It may only be used by the
                 person to whom it is provided, for the stated purpose for which it is provided, and must not be imparted to any third person
             without the prior written approval of Callaghan and Toth. Callaghan and Toth reserve all legal rights and remedies in relation
                                             to infringement of its rights in respect of its confidential information.
                                                                       ©
                                                               Callaghan & Toth
                                                                     2020




                                                                                                                                                           2
2035 2 Pearsons Road – Flood Study                                                                                            September 2020
Log in to download the original file

Appendix C - Flood Report_Sept2020.pdf · 9.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 39 pages

Page 2

                                                                                                                                     Callaghan & Toth




CONTENTS

1.0      INTRODUCTION ...............................................................................................................................5
2.0      FLOOD IMMUNITY............................................................................................................................6
3.0      STORMWATER DETENTION REQUIREMENT ................................................................................7
   3.1      Broad-Brush Estimate of Required Detention Volume ...................................................................7
   3.2      Hydrologic Model Set Up ...............................................................................................................7
   3.3      Model Determination of the Required Detention Volume .............................................................10
   3.4      Provision of Required Detention Volume .....................................................................................10
4.0      SUMMARY ......................................................................................................................................12
APPENDIX 1              - Reconfiguration of a Lot Layout plans .......................................................................... A
APPENDIX 2              - FLOOD CALCULATIONS ............................................................................................. D




                                                                                                                                                 3
2035 2 Pearsons Road – Flood Study                                                                                    September 2020

Page 3

                                                                                                Callaghan & Toth




LIST OF FIGURES

Figure 1.1                    Site Location Plan……………………………………………………………....5
Figure 3.1                    URBS Model of the Pre-Development Catchment Condition………..8
Figure 3.2                    URBS Model Of the Post-Development Catchment Condition…………...9
Figure 3.3                    Proposed Stormwater Detention Facilities………………………………….11




LIST OF TABLES

Table 1             Predicted Peak Outflow Rates……………………..……………. ……………………..9
Table 2             Required Detention Volumes …………………….……………. ……………………..10




                                                                                                         4
2035 2 Pearsons Road – Flood Study                                                  September 2020

Page 4

                                                                                                          Callaghan & Toth




1.0       INTRODUCTION
This Flood Study has been prepared as part of the Reconfiguration of a Lot application to Noosa Council.

The lot contributing to the overall development and subject to this report are shown in Site Location Plan, Figure 1.1
and are described as Lot 3 on RP113733, located at 2 Pearsons Road, Cooroy.

The site is traversed by a tributary of Six Mile Creek, which flows across the north-eastern corner of the lot.

Most of the increased stormwater runoff from the proposed residential areas is proposed to be mitigated by
conventional detention volumes in the bio-retention basin proposed for the site, with some proposed to be attenuated
by the installation of EcoAID cells on the site.

The development proposal is particularly cognisant of the need to not increase local stormwater discharges (as
distinct from tributary channel through-flows) onto an adjoining property to the north.

The assessment process was therefore structured as follows:
     Determination of the required detention volume - as described in Section 3.0 of this report.
     Calculation of the runoff rates to the floodways and running them though floodway models of the pre and
        post-development scenarios – as described in Section 2.0.




                                                                                 Site location




Figure 1.1:         Site Location




                                                                                                                   5
2035 2 Pearsons Road – Flood Study                                                            September 2020

Page 5

                                                                                                         Callaghan & Toth




2.0       FLOOD IMMUNITY
The 100 year flood levels across the north-east corner of the site have been abstracted from a flood study
undertaken by Brisbane Stormwater Management Pty Ltd for the adjoining Erindale Development in 2014. The
relevant flood levels are 100.19 m AHD across the eastern (upstream) boundary of the site and 99.85 m AHD across
the northern (downstream) boundary of the site. Those flood levels are marked on Figures 3.2 and 3.3 hereafter,
together with the inferred 100 year flood boundary between those two levels.

The proposed lots are seen, in comparison to the 0.5 metre contours on Figure 3.3, to be at least 1.5 metre above
the flood profile and should therefore be immune to 100 year flooding, even with a 20% impost on the design rainfalls
for future climate change.

The only intrusion of the development into the 100 year floodway is seen to be a small part of the outer batter of the
proposed detention basin. The loss in 100 year flood storage as a result of this intrusion is estimated to be about 9
cubic metres, which should have practically no impact on the 100 year flood profile.




                                                                                                                  6
2035 2 Pearsons Road – Flood Study                                                           September 2020

Page 6

                                                                                                  Callaghan & Toth




3.0       STORMWATER DETENTION REQUIREMENT

3.1       Broad-Brush Estimate of Required Detention Volume

The proposed reconfiguration of the site, seen in Figure 3.2, will comprise 19 lots (18 new lots) and an
internal road and a park. Lot 19 will retain its existing structures and other paved areas, thereby having no
impact on the site’s stormwater runoff. The remaining lots, 1 to 18 and the internal road, will have a
combined area of 1.41 hectares.

The required 100 year detention volume is expected to be in the range 250 to 300 cubic metres for each
hectare of a development platform of this lot density. For the abovementioned 1.41 hectare platform, this
equates to a 100 year detention volume in the range 352 to 423 cubic metres.


3.2       Hydrologic Model Set Up

For the sake of simplicity at this Lot Reconfiguration stage of the development application, the required 100
year detention volume has been determined by URBS modelling of the pre-development and post-
development catchment conditions, using the ARR87 design storm rainfall data with a simple
initial/continuing loss model.

A more complex modelling procedure at the Operational Works stage, using the Bureau of Meteorology’s
2016 design rainfall data, will most likely result in a slightly smaller detention volume.

The pre-development catchment condition and the relevant catchment area and model subareas are
shown in Figure 3.1. The modelled catchment includes the existing development to the south, which
features a 525 mm diameter bypass pipe with a full-flow bypass capacity of 0.46 m3/sec (or slightly more
than Q5) to conduct lower flows away from the proposed development site.

The modelled catchment includes the site of the proposed open detention basin but excludes the area of a
proposed park in the north-east corner of the site, which will not be noticeably impacted by the proposed
development.

The total catchment area in the model is 3.3 hectares, consisting of 1.47 hectares in the adjoining
development to the south, 0.11 hectares of external property at the Pearsons Road frontage and 1.72
hectares within the site itself.




                                                                                                           7
2035 2 Pearsons Road – Flood Study                                                    September 2020

Page 7

ail

Callaghan & Toth

 

 

 

 

CATCHMENTBDY 50m “*
renee

 

 

Figure 3.1 URBS Model of the Pre-Development Catchment Condition

The Urbs model of the post-development catchment condition, covering the same overall catchment area
as the Urbs model of the pre-development condition, is shown in Figure 3.2. The model's sub-area
network for the external catchment in the adjoining development to the south is identical to that used for

the pre-development model.

2035 2 Pearsons Road — Flood Study September 2020

Page 8

ail

Callaghan & Toth

 

   

\ 0 SCALE 50m

be

 

Figure 3.2 URBS Model Of The Post-Development Catchment Condition

The models’ operating parameters comprised the commonly-used default value of 1.2 for the alpha
parameter and an m (non-linearity) exponent of 0.8. The initial rainfall loss was set at 20 mm and the
continuing loss rate was set at 2 mm/hr, for all of the modelled ARI’s from 1 year to 100 year.

The models’ predictions of the peak outflow rates from the system, at the location of the outflow from the
proposed detention basin, are summarised in Table 1 hereafter. That tabulation also includes Rational
Method calculations of the peak outflow rates, to provide a sanity check on the models’ performance.

Table 1: Predicted Peak Outflow Rates (m3/sec)

 

 

 

ARI Pre-Development Post-Development
(years) URBS Rational Method URBS Rational Method

100 0.93 1.08 1.06 1.27

20 0.62 0.59 0.74 0.73

5 0.43 0.40 0.53 0.48

1 0.16 0.21 0.25 0.25

 

 

 

 

 

 

 

2035 2 Pearsons Road — Flood Study September 2020

 

Page 9

                                                                                                Callaghan & Toth



3.3       Model Determination of the Required Detention Volume

The hydrologic modelling process at this Lot Reconfiguration stage has determined only the required
detention volume and has not calculated the exact dimensions of the outlet control works that would
accompany that volume.

The required detention volume was determined by adding a tabulation of storage-discharge pairs to the
model of the post-development condition and then successively adjusting the storage values in that
tabulation until the peak outflow rates exactly matched those from the model of the pre-development
condition. The result is summarised in Table 2, below. The Required 100 year storage requirement is
predicted to be 398 cubic metres, or just over the middle of the range of the broad-brush assessment.


Table 2:      Required Detention Volumes

    ARI         Pre-Dev. Outflow            Post-Dev. Outflow (m3/sec)                   Storage Volume
  (years)           (m3/sec)                                                              Required (m3)
                                          No Basin                 With Basin
    100                 0.93                1.06                      0.93                      398
    20                  0.62                0.74                      0.62                      285
     5                  0.43                0.53                      0.43                      216
     1                  0.16                0.21                      0.16                      128



3.4       Provision of Required Detention Volume

The required 100 year detention volume of 398 cubic metres cannot be achieved in a single storage facility
without displacing protected vegetation or depreciating the lot yield or pedestrian access to the creek. The
volume is therefore proposed to be provided in two facilities, comprising an open bio/detention basin with
351 m cubic metres and an EcoAid underground facility with 47 m cubic metres, as shown in Figure 3.3,
hereafter.

The 100 year water depth in the basin, above the top of the sand, is expected to be 1.05 metres, which will
provide for a weir overflow depth of 0.15 metres and 0.2 metre freeboard to the crest of the embankment.
The freeboard is approximately 20 percent of the water depth and the basin should therefore be able to
contain the inflows from a greenhouse-induced 20 percent increase in storm rainfall intensities.




                                                                                                        10
2035 2 Pearsons Road – Flood Study                                                  September 2020

Page 10

 

Callaghan & Toth

 

NORTH
ee),

   

 

18

    
 

 

 

7
7
4
7
7
7
/ J
Y Jf
x= J
— 4 /
x Yo & J
> 5 a
+ ° “a /
1 SCALE 25M
| ee
Figure 3.3. Proposed Stormwater Detention Facilities
1
September 2020

 

2035 2 Pearsons Road — Flood Study

Page 11

                                                                                                 Callaghan & Toth




4.0       SUMMARY
The proposed residential lots front the creek’s floodway will have at least 1.5 metre freeboard to the 100
year flood level and the proposed development is therefore expected to be adequately flood-immune, even
with a 20% impost on the design rainfalls for future climate change.

The small intrusion of the outer batter of the basin into the floodway will depreciate the 100 year floodway
storage by about 9 cubic metres, which should have practically no impact on the 100 year flood profile.

The required 100 year stormwater detention volume of 398 cubic metres can be achieved, within the site’s
constraints, by two facilities – a 351 cubic metre open basin and a 47 cubic metre EcoAid underground
facility. A more complex modelling procedure at the Operational Works stage, using the Bureau of
Meteorology’s 2016 design rainfall data, could result in a slightly smaller detention volume.

The open basin will have a 100 year water depth of 1.05 metres. The freeboard of 0.2 metres to the
embankment crest will be sufficient to contain the inflows from a greenhouse-induced 20 percent increase
in storm rainfall intensities.




                                                                                                         12
2035 2 Pearsons Road – Flood Study                                                   September 2020

Page 12

                                                                                     Callaghan & Toth




APPENDIX 1                    -      Reconfiguration of a Lot Layout plans




                                                                                              A
2035 2 Pearsons Road – Flood Study                                           September 2020

Page 13

                                                                                                     RP881300
                                                                                                                                                                     99


             6
           10
                                                                                                                                                              RP881300




                                   4
                                                                                                                                                                Park                        Civil, Environmental &




                                 10
                                            S
                                                                                                                                                                                            Hydraulic Engineers




                                                                                      102
           14




                                                                                                                                                                          100
                            15                             16                               17
                                                                                                                                                  Tra
                                                                                                                                                     ck




  EJ


                                                                                                          18
                                            EJ




                                                                                                                                                                                       86
                                                                                                                                                                                     66
                                                                                                EJ




                                                                                                                                                                                 19
                                                                                                                                                                                SP
                            EJ
                                                                       ROAD




                                                                                                                                                                                  0
                                                                                                                                                                                10
                                                                                 EJ




                 5               4
                                                            3                               2                                         EJ
                                                                                                                                                                ck




                                                                                                                                                               tA
                                                                                                                                                              a
                                                                                                                                                           Tr




                                                                                                                                                             Em
                                                                                                                 1
  38                             Timber R




                                                                                                                                                          102
                                         etaining
                                                    Wall
SP305293

                                                                                                                                                                                 101
                                                                                                                                                                                SP291337
                       37
                                                                                                                     104




                     SP305293                                                                                                                                                     Park
                                                 36
                                            SP305293              35                                     33
                                                                                                                                    Emt AQ




                                                                SP305293                              SP305293




                                                                                                       34
                                                                                                                           Emt AR




                                                                       WM
                                                                                                     SP305293
                                                                            EJ
                                                                                                                                             CT

Page 14

                                                                                                                                                                                                                                   Civil, Environmental &
                                                                                                                                                                                                                                   Hydraulic Engineers




                                                                              16
                                                                            RP881300
                                                                                                      15
                                                                                                    RP881300                         14
                                                                                                                                RP881300
                                                                                                                                                                       13
                                                                                                                                                                  RP881300
                                                                                                                                                                                                                     12
                                                                                               110                                                                                                                 RP881300
                                                                   110




                                                                                                                                                                        1 08
                                   AD                                                                            BM: Pin
                                                                                                                 RL: 109.315                                                             S




                                                                                                                                                                                                                           6
                                                                                                                                                                                                                        10
                                 RO

                                                                                                                                                                                           BM: Pin
                                                                                                                                                                                           RL: 107.32




                                                                            20                                                   12

                                                                                                                                                                            13                                        14
                                                                                                                               11
                   S
            ON




                                                                                                                                                                  EJ
                                                           2                                                                                                                                                  EJ
            S




                                                     RP113733
         AR
     PE




                                                                      110




                                                                                        9                                      10
                                                                                                                                                             EJ


                                     Single Storey



                                                                      8
                                      Brick House                                                                                                                           EJ



                                    19




                                                                                                                                                                  ay
           BM: PM24974
           RL: 110.614
                                                                                                                                                 7                                    6




                                                                                                                                                             Pathw
                                                                                                                                                                                                                               5
                                                       0
                                                     11
                  Emt AS
STREET




                                                                                              108




                                   44
 ELM




                                                                                                                               106

                                                                                                                                     Timber Re
                                 SP305293                                                                                                     taining W
                                                                                                                                                       all



                                                                 43                                                                                                              Timber Re
                                                                                                                                                                                           taining W
                                                                                                                                                                                                     all

                                                               SP305293                42
                                                                                   SP305293              41                           40                                                                     38
                                                                                                      SP305293                                                           39                                SP305293
                                                                                                                                SP305293                               SP305293
                         Emt A

Page 15

                                                                                                                                                                                              ROAD
                                                 SC




                                                                                                                                                                                SC




                                                                                                                                                                                                                                                                               0
                                                              E
                                      + SC                                                                                                                                                                               SC




                                                                                                                                                                                                                                                                                10
                                                                                                                                                                                                EJ
                                 SC




                                                                                                                                                                                                                                      100W
                                             E                                                                                                                                                                      SC




            +
                             +




                                                                                            ay
                                                                                                                                                                                                                                                                                          Civil, Environmental &
                            SC
                                                                    7                                     6                                                                                                                                                                               Hydraulic Engineers




                                                                                    P a th w
                 + SC            E

            SC
                        E
                                                                                                                                         5              4
                                                                                                                                                                                     3               2




                                                                                                                                                                                                                                               100W
                                                                                                                                                                                                                                                                      k
                                                                                                                                                                                                                                                                   ac
           108                                                                                                                                                                                                                                 EJ




                                                                                                                                                                                                                                                                          tA
                                                                                                                                                                                                                                                                Tr




                                                                                                                                                                                                                                                                  Em
                                                                                                                                                                                                                         1


                                             106
                                                        Timber Re
                                                                  taining Wa
                                                                               ll


                                                                                                      Timber Re
                                                                                                               taining Wa
                                                                                                                         ll

  42
SP305293                    41




                                                                                                                                                                                                                                                    100W
                                                         40                                      39                             38                      Timber Re




                                                                                                                                                                                                                                                               102
                   SP305293                                                                                                                                      taining W
                                                                                                                                                                          all
                                                      SP305293                              SP305293                          SP305293

                                                                                                                                                                                                                                                                                101
                                                                                                                                                                                                                                                                               SP291337
                                                                                                                                               37




                                                                                                                                                                                                                              104
                                                                                                                                             SP305293                                                                                                                            Park
                                                                                                                                                                      36
                                                                                                                                                                    SP305293             35                  33




                                                                                                                                                                                                                                             Emt AQ
                                                                                                                                                                                     SP305293             SP305293




                                                                                                                                                                                                           34




                                                                                                                                                                                                                                    Emt AR
                                                                                                                                                                                                         SP305293




                                                                                                                                                                                                                                                           T
                                                                                                                                                                                                                                                       REN C
                                                                                                                                                                                                                                             BLUE W

Page 16

                                                                  Callaghan & Toth




APPENDIX 2                    -      FLOOD CALCULATIONS




                                                                           D
2035 2 Pearsons Road – Flood Study                        September 2020

Page 17

 

PROJECT PAGE No

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

 

 

 

 

 

LALCLAD CAA 6 PYE PC

 

 

 

 

 

Suateer | PrAéics
Brend- Brisk Dekh) bs fcnse 4
Byp oss Ca pr % | 2
Devan BoA Tibn~v Be | 3
Lachine! Metled—Exishag | | 4-S
heokdoncol tthe ~ Dee ta pree! 6-7
ULBS Cothasd Fife -| Bxskoy e-/0

URBS| Catehad File | Deve lapved y-1B

 

URBS Rake ae/ Saa He Che Zz & 1G-
Sterdge Dotetn: aah (Ss 9
Ck wR ej Le Chucks to Dex 'S -2Z_
o 7

 

Fed op /o oeN S Fevogh 2S

 

 

 

 

 

 

 

 

 

 

 

 

DGOGLE B/D 129

 

Page 18

 

PROJECT

PAGE No

 

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

ee

 

BROAD — BRUSH BETTER

VOM VOL

WHE

 

cas chprctishes|

 

° Few

ot

‘ i ; ey
Th. eo eva/o por. Si hes

ae lo fr eat will

The. pe posed hacks

19 £26

Go

wot change Sao

beet in rhe? oy MW Adz ates COME

s

 

 

Aro
road,
1.4/ Aa.

we pirpesed hes
Whe rene o

is /—- 1S

ra

Cee OF

Jhis fp (ot te

zt
pid 7ha! {ire poste

78

 

¢@

. 2
At | ASE we

 

oA dete

m Ah

i
;

phew vd/u we par fee

L
fe a:

BS

 

develpment plath
ve jutae 19

Ll X2T0

he ber

Ss.

2 a

5 a breed detenDlon
ee aheat ‘ean

 

 

 

 

 

 

 

 

 

 

 

' DGOGLE

 

 

7/2 1206

te

Page 19

 

PROJECT

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

PAGE No

 

|

 

 

BYPASS CFPAECTY

 

Hho.

 

 

Bhan AU

by pass ZL. Lt ae:

Oh a et, Be

4unS

B28 S24

Adjoining

SB Gi

My actencetl Ly Lax

| sped

 

Pad | WA
ban. pe 4
sballnge 7 L a

i
{
1

soul
fare

 

Stor

b. (AD SS pe
| ia
a inrorglcr or Lf
ac oy ad” 2

phe in 4

PESEE A fare a

 

 

 

 

 

 

cy ZA. |
e Callng har dy Zens Calaneif Pyproved C20 78) #O LZ.
Jobat onr te Hh. by grass jndreaks a lesion
; {7 4
Phi ef a, 63h mk 27 & AOL of 104.602
Oo saree Jere oF yo5\359 ) DAS a Pwd
cf 70S. 20 Ss lof Se rath ene feweL of lod: ss).
==? Reap = 705. 559 — foZ2~-16 s\'> C4 Fh
764.602. —/C7. $25)
ne C.4L A 4
| |
f

 

 

 

 

 

 

 

 

 

 

DGOGLE ys

 

 

12 1/20

Page 20

 

 

600

50 |

400
300

200
150

400
80

60
50
40

30

20

ROOD os

o

Do

Hehe

 

 

   

 

   

    

 

 

y : DESIGN RAINFALL INTENSITY CHART E
1 | Location 26.4608 152.925E NEAR. COOROY ae 4 E
q issued: 99/2620 F
q AVERAGE RECURRENCE INTERVAL Me

—— 100 Years(upper curve) os F
q — 5 Years E
7 — 2 Years F
q —- 1 Yearliower curve E
q (Raw data: 50.29, 10.53, 3.45, 91.27, 24.09. 8.6. skew=0.13, F2=4.39, FS0=17.57) ‘© Australian Government, Bureau of Meteorology ry
Ln eee ny 7 T 7 . T
5m6m 10m 20m 30m thr 2hr Shr 6hr 12hr 24hr 48hr 72hr

DURATION IN HOURS OR MINUTES

7] KR STD

oC
5
AC

3t

he ee em eNom

+ animale e

Page 21

 

PROJECT

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

 

 

RATIONAL HET

ACD — EXISTIA; 6 F7E DiScHARCES

 

Ealerpa /

 

©

Am pe reas Fa

t latched Spea = 1.83 ws LrAtecna! -- 1 4) G2

> 3.8 Th
LAens == = a Infer a/ de x2 \%

Ete ca)

 

4 Conegada/in.

> Cro ancl ChetPeicc!s

|
|

[= 69. & ©.79
|

 

TD ref? wot: 19 Op she? ew & 64 ave ges

<8 4 ms)

 

yp
Exdetnal: Bm skeet dase @ ide = Einin |
. E203 Saale. a Co f 4 + BLanys 21)
yOm yd 7d bate ify 1S nurs i Tarirs
ST” ibs (et Ciel, er o.7 mas /
ion thf, nll & lng = ZF MIS

 

= 6.807)

* Qypg =| (00278 KI-Zr C.65 x/90x|483) |

+ Lis|co2 78x [2x 0.79 190K /G7) —c.“6]

 

 

|r le.%-e.40é] = 1,08 nh,

{
|

 

 

75 KOS ke. 67 Kae Xt #3)

ple eoZ73 xe S Ko. Bx les x LG?) —6.46\f

 

’ Cis j= (caolre x wast 2.000 «| (Zax / BS .
| + [de 27% Ke. IS Xe. 4 x (20 x43 —o.¢é]

+ [bases =6.06) = 2.59 mh

 

tes 27S K 640 x 6.65 x 74 L383; =

i= OGOO + [e384 —o we | ==> c.4O me,

CS gn

 

 

 

 

 

|
DG OGLE

 

 

 

Page 22

AQ INAWHSLWS

 

 

Page 23

 

PROJECT PAGE No
2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT &

 

i

 

Rarioval METHOD — DEVELC PES SITE DiscHAR CX

 

 

© Cthmeat Area = 133\th Tnfeaal + 147bx Extecya/

e Zo pervia as Palins = Sor Fesbleceuntadl & S Zye Exjaned

 

=> Cro kane Koc ents = ©.78 4 €,7/9

e Cond anata Time:

 

Tite nals

 

COm shee T Abs, are gy” os, & Ad ss 3) ans
ve > 4.5) iS} Saas
x

 

 

 

4s an Ow eal: Nie & C Gc CLS ns cd MAS

$20 In pipes act CH = OLY mins 7
Exferns | | CT

B an Cad t nd @ 1% = Sn aS, (es : \
Eat Zack Be a Ce Sg) = & mias Mawie§
Bi pps ppt, © ¢ pC en [5 = 5 alas t
57 a J for @yhe AS as = CCT mAs, 16.fnr9
Fb ov LPG @ / "ys = 13S was

fe <2 O.8 ning

(2.0 try pp froMd ce

oe: = (0.022797 1.2X6.78|x 260 X /8(3)
+ [le E278 Ki-2\ KO. B K 20le Lgg- o4é | :

=| 0.952 tf 6.775 —e.“é] = /.2 7p 45 ja € rE ASE )

 

>
y

 

° CX20 = Co OOLZTY KX/OS &E.IS KISSER]. 33)
4 e.c6278 x 1.05 |x 0.79% ISIS X paD\+o. e]

t C.698 4: Los36 a c.44 Jo 7 3h 26% NOEA

ps

x

NY

 

i

(e.Co2T$ x ©: 55 xo 78 «125 x53) .
+ KLOE.& 279 X COS KETIXILE Kha) — 0.46]

*
Oo
deh
St
il

 

 

+ 0.4%3 + | ¢.392\-6 46] + 0.45 mh (20 fh ideneax)

 

 

 

» & se eor7h x BO x6 7S ¥79|K/BS =|6252% (207 needy )
i DG OGLE S/ 9 /Zo

 

 

 

 

RS (C2 aye 4 inerease 20% )

and

Page 24

~— eee °

 

 

 

Page 25

2 Pearson Rd Cooroy - Existing.cat
Model: Basic
Uses: LUI
Default Parameters: alpha=1.20 m=0.8
13 Subareas of Area:
0.0011 0.0010 0.0036 0.0032 0.0032 0.0026 0.0041
0.0022 0.0041 0.0025 0.0031 0.0015 0.0008
Factor=1.50
Rain # 1 L=0.030 U=0.00
Route L=0.030 U=0.25
Store.
Rain # 2 L=0.015 U=0.00
Get.
Route L=0.030 U=0.25
Store.
Rain # 3 L=0.020 U=0.20 I=0.55
Get.
Route L=0.045 U=0.20
Store.
Rain # 4 L=0.020 U=0.20 I=0.55
Route L=0.056 U=0.20

Get.

Route L=0.036 U=0.50

Store.

Rain # 5 L=0,030 U=0.25 I=0.55
Store.

Rain # 6 L=0.030 U=0.25 I=0.55
Get.

Get.

Print. TMR1

Loss C=0.46

{Throws away everything up to 0.46 m3/s}
Print. TMR2

Route L=0.060 U=0.00

Store.

Factor=1.00

Rain # 7 L=0.051 U=0.00 1=0.20
Add Rain # 8 L=0.027 U=0.00 I=0.00
Get.

Route L=0.093 U=0.00

Store.

Rain # 9 L=0.033 U=0.00 I=0.00

Get.

Page 26

 

Route L=0.039 U=0.00
Store.
Rain # 10 L=0.075 U=0.00 I-0.02
Add Rain # 11 L=0.066 U=0.00 I=0.00
Get.
Store.
Rain # 12 L=0.033 U=0.00 I=0.00
Add Rain # 13 L=0.021 U=0.00 I=0.00
Get.
Print. OUT
End of Catchment Definition.
1 Pluviographs:
Location. ARR_ TEMPORAL DATA
13 Subareas:

1234567

8 9 10 Il 12 13

End of Pluviograph Data.
End of Gauging Station Data.

Page 27

ee Te eel

        

NORTH

Faye 10

PASS (raimee  B
ORES CaPRe reg

Seen fief it

            

 

4
\ ‘ CATCH wen got”

; &

a 0 SCALE 50m

 

 

Page 28

2 Pearson Rd Cooroy - Develop.cat
Model: Basic
Uses: LUT
Default Parameters: alpha=1.20 m=0.8
13 Subareas of Area:
0.0011 0.0010 0.0036 0.0032 0.0032 0.0026
0.0024 0.0023 0.0019 0.0015 0.0047 0.0047 0.0008
Factor=1.50
Rain # 1 L=0.030 U=0.00
Route L=0.030 U=0.25
Store.
Rain # 2 L=0.015 U=0.00
Get.
Route L=0.030 U=0.25
Store.
Rain # 3 L=0.020 U=0.20 I=0.55
Get.
Route L=0.045 U=0.20
Store.
Rain # 4 L=0.020 U=0.20 I=0.55
Route L=0.056 U=0.20

Get.

Route L=0.036 U=0.50

Store.

Rain # 5 L=0.030 U=0.25 I=0.55
Store.

Rain # 6 L=0.030 U=0.25 I=0.55
Get.

Get.

Print. TMR1

Loss C=0.46

{Throws away everything up to 0.46 m3/s}
Print. TMR2

Route L=0.078 U=0.00

Store.

Factor=1.0

Rain # 7 L=0.072 U=0.00 I=0.20
Factor=1.5

Add Rain # 8 L=0.036 U=0.25 I=0.55
Store.

Factor=1.0

Rain # 9 L=0.045 U=0.00 I=0.17
Factor=1.5

Page 29

Add Rain # 10 L=0.030 U=0.25 I-0.60
Get.
Get.
Route L=0.030 U=0.50
Store.
Rain # 11 L=0.020 U=0.25 I=0.60
Get.
Route L=0.057 U=0.50
Store.
Rain # 12 L=0.020 U=0.25 I-0.60
Get.
Route L=0.049 U=0.50
Add Rain # 13 L=0.021 U=1.00 I=0.25
Print. OUT
End of Catchment Definition.
1 Pluviographs:
Location. ARR_ TEMPORAL DATA
13 Subareas:
1234567
8 9 10 11 12 13
End of Pluviograph Data.
End of Gauging Station Data.

Se

 

Page 30

NORTH

—_— ee

 

qj

4/9

 

 

 

 

Page 31

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT PAGE No
2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT 1g
Le87) 05 4 DEVELOPED MITIGATED
ARE | BM, Uaes | Qu URES CURBS)
100 yr /.c8 0.93 1.27 poe 0.93 ~
co =e 14395 pe shroge)
|
20 yr 0.55 662 1673 | o.% OL
(283 stay»
|
Tye 0-40 |0643 \lo4ay O53 0.43| 7%
| C216, my Sve ye)
Ye O.2/ ONG 0,25 0.25 OG |“
C ® 5 tragey
2S ln 5 GE
tables pp)
| Os on blhwing) Page
|
DG OGLE AYLI [2e

 

 

 

 

Page 32

 

PROJECT

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT LS

PAGE No

 

 

 

s

§7OR

 

| |

Boe DISCHARCE| ¢ CRUE:

wif he

 

AS 5 be sa cba Ad a 2A6 aye mechonisan

bev

to (OC mL SS
Ss

=D Dara =

|
eS xoyZe 2b rn *

 

At
imy

o
Ais eharge vebhe-k, ey o.gr oC. m

p/hres > ed eae capreity of

 

Z. Phis

4

O.8/ mah

 

@

Ass a
he ve

ft 2

} t. - bad - sholow pechag whe 5 pduct

ha Iyvo \~ Jeve./ one? Proien bie é

AA SE uy ighaaacly.” ( eHhect be. Sid Cre

A fe be
So YS Wo

 

Sa,
ad

va
Cle 7 re e & wa Lo we wl oboe

oY ee ban ine , about cA oF Q, A af

"3a Son peigessetel

 

AA

ro FOr>9¢ 5 53y Ons 2

np ile SU COLES IVR Line $ rs S-

AOm? stage.

Q Able.

 

Ab aes pes , Ant Hon aebyus?

Ls Dit gon ack! Se AES sve Li

contain sj ZO 7) i 2 peo cert | xa.

sroaage
See ch Aah

 

 

 

Vv
Se pedal C mre thal dha chosen stage
la lame an dot hen pockines he repsuced

 

 

SULT 0 Kee yet? hee? 106 yr 87

 

 

em ane] mig |e
' 4s “256 mn !

(232 »* iy an 14) be + oho

flat? mn ) DG OGLE

 

[Pai ak xl Had | Fixe |

al eo yea ae

 

 

7? / 9 (26

ic

Page 33

2 Pearson Rd Cooroy - Mitigate.Cat
Model: Basic
Uses: LUI
Default Parameters: alpha=1.20 m=0.8
13 Subareas of Area:
0.0011 0.0010 0.0036 0.0032 0.0032 0.0026
0.0024 0.0023 0.0019 0.0015 0.0047 0.0047 0.0008
Factor=1.50
Rain # 1 L=0.030 U=0.00
Route L=0.030 U=0.25
Store.
Rain # 2 L=0.015 U=0.00
Get.
Route L=0.030 U=0.25
Store.
Rain # 3 L=0.020 U=0.20 I=0.55
Get.
Route L=0.045 U=0.20
Store.
Rain # 4 L=0.020 U=0.20 I-0.55
Route L=0.056 U=0.20

Get.
Route L=0.036 U=0.50
Store.
_ Rain # 5 L=0.030 U=0.25 I=0.55
Store.
Rain # 6 L=0.030 U=0.25 I=0.55
Get.
Get.
Print. TMR1
Loss C=0.46

{Throws away everything up to 0.46 m3/s}
Print. TMR2

Route L=0.078 U=0.00

Store.

Factor=1.0

Rain # 7 L=0.072 U=0.00 I=0.45
Factor=1.5

Add Rain # 8 L=0.036 U=0.20 I=0.55
Store.

Factor=1.0

fog /

Rain # 9 L=0.045 U=0.00 I=0.17 - et OY
Factor=1.5 Za 2 Ce

7/9/20

Page 34

Add Rain # 10 L=0.030 U=0.20 I-0.55
Get.
Get.
Route L=0.030 U=0.50
Store.
Rain # 11 L=0.020 U=0.25 I=-0.55
Get.
Route L=0.057 U=0.50
Store.
Rain # 12 L=0.020 U=0.25 I=-0.60
Get.
Route L=0.049 U=0.50
Add Rain # 13 L=0.021 U=1.00 I=0.25
Print. BASIN
Dam Route VBF=0.0 Number=6
{THOU M3 CUMEC}
0.000 0.00
0.040 0.12
0.128 0.16
0.216 0.43
0.285 0.62
0.398 0.93
Print. BASOUT
End of Catchment Definition.
1 Pluviographs:
Location. ARR_TEMPORAL DATA
13 Subareas:
1234567
8 9 10 11 12 13
End of Pluviograph Data.
End of Gauging Station Data.

>

F, rf B, i fee

Page 35

 

~ 100.19

20m

SCALE (1 CM =2.5M)

 

2

Page 36

 

PROJECT

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

PAGE No

 

(2)

 

STORAGE Yol

UIE &F PRELIMINA

 

Ry BAS) DRAWH GC

 

 

 

 

 

 

 

las Pet dawidg on n&xt foage)|,
7a p Of Wall = 10/. oF
5 &. 5S \of Porenen
Weir Crest = 100,66 ) At A fewaw
Z fours Ang 7
Ontize ft = 99-97
j os oh ieresxel .
Top of brA | 99-€6 |
c|@age>
|
Spade bafes . = J wr 3
Bas4 Ares. = [DXS = 152 n*
|
Dead Sprage lime. C24 Borie |". 99G/
v |
Care Volume - SZ x lo 3 = 46 me?
Lad bors = 2% B xe). FxKOI KOS = 2.2 ms
Sle fersas I 2 ¥ /G x4.Z RIGROIS = S/ als
Corns Cones = Vg x 0. 785x437 K0)3 =0.2 mF
| 53 ns

Fetal Vo lunge

To Wer Brest Ch EL [00.66

1.05 above, fax \

 

 

|

 

 

 

 

 

 

 

 

 

Lore VYotline |= 152% LOS = Om
End Pisa = 2x Bx OTK FS x¥OS =26.S m5
Side| Frisas |= 2RIDK/OS KZISXOS = 62.3 WF
Corker Cones = ex. oss ® 6.37 L0S= 70.9 InP <
260 m2 (20pm mere. han
dead sfrvage )
|
Teta! Volume|Je Ohm |Frecheard |\Co EL 1049), 1.30 abeve. bow)
Core Volume |= 152 x 1130 | = vesn3
Ent| Pogsns |= ZX EXE KX FG KOS = 406 as
Sicle Posms |= Qe 19X23 *39 KAS = 96 FR mF
Corner Cons |= VER O7BS x 7EFAKLT = Zo Mm
Fsé ps C0 2m mere. dat
Aéad Ieege) |
= : j of 3
Bu7 hell chet et 296 a abe i
= df 6 Le 4
DGOGLE 7/ Qo f/2e

 

 

 

 

 

 

 

Page 37

 

PROJECT

PAGE No

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT ZO

 

 

PRELIMINARY

Desi CW REVESIONS

 

 

i D Dee, 4 Ores

 

 

by 2:) m, > 29.8
“Qesi Jot OO yi Bee ra lot O.2n,
Dead 5 Ferage Ve fame be comes: .
Lede Valu | = isan 0.2 = Bo lam? >)
End \Prjs nS = 2x SKOOL KOLKOS = 1 Oms 24 =
Side PA sas = 2xi9xOo.2 xO. xes = 2.303

DA Volume To

O.alm Free hore Beames:

 

 

 

 

 

 

 

 

 

 

==> Newt

 

=> > (DUBE) R16 =27nF

Line Shrege = SU +27 = 38/ as

 

Coma. Velsas | = 152 |K 420 = 184.4m>
Erd Prtgnd = 2KEK/AZ X3ExOS = Su lm 2 Smo
Sida Pris as = RID yf 2y 3-6 nO.S = F2 Ant -
Carper Gre 12 Breas xX 72* 472 = 16/3 7
Neti Le Sferage = 31S -3y = 28/ wn.
(Agra J “ee4 she rt et SIS Le required )
@ Lehghon Absin 7.5m So B Ba no
Shim
010 yr watered R-Seett , abo re dead stay \ yo /
top ee BLY hsm = An *
> Ned. Live Storage = 26/ a AZ = 324 m*
SAY short of SIS = required )
/ B Wider delete J. On| ps hs wert 2917
ldoyr_watelvan as x- sat abhere dood shrag c At Be be
23-7

 

 

yr Sh,

|

 

 

47 n> Shor? of SIS

 

 

| DGOGLE

 

m rege mint,

 

 

7/2 fée

Page 38

 

PROJECT

2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT

PAGE No

2/

 

 

 

@

Add Exohod Un

 

rong tung
7

avid é  ©O

l Shrge-
oA

-77 wa LA shea 4

 

Zee Azd LS a it's ~
per Mra. AL Jengh
pr +d as back #;

)

Cinele Arn

J Steroge in Ad

Ab

 

W

2 Fr Ye DPere Fe
eed Z7/o.77
Easel udie das

ie
f= Ef

2 wel 2

5:

 

i

=> Wa m be of Ai
52g: 2 revs oF

its rg
32 anitts,

Hicailenn hengh of 2.D7 an
= “/o.97 = 63 aaih,

 

Eaeh row Tho-vhy

S2xKe

 

DI= 3/ yo. tes

aru
’

 

 

 

 

 

 

 

 

 

 

 

 

DGOGLE

 

¥, 192 pe

 

 

 

Page 39

Page ae.

NORTH

 

Wo fee

>
ee
=

ee

eal
a

Page 40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT PAGE No
2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT Os
|
FLOOB PLAIN \STORACE Ceri PEWS ATION
!
Typrval Lill Cross Sele hen L.
if LO
Ds
ALS | ~ . L _ _ [16° YR Ficod)
(__
3.86 j | pes
tee ;
Ag = ya 3.5 XO.71 =O.9T5m 9 KX 2 Ini 2. Gem
ed teal Exe Quehn Cass r Seeta: |
NS | Ole
< _ Igo il
<= Re
fy: Yo xB ¥ OL“ = O.Sé6n*% Ct]Eed jwuch)
ve oe
lig ZO
[38 :
LN ie gn TNS
At ex 8 K6O0S = |O.F br (neo ence h 5

 

 

 

 

 

 

 

DG OGLE

 

 

 

 

PIS 20>

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.