Appendix C - Flood Report_Sept2020
Callaghan & Toth
CONTENTS
1.0 INTRODUCTION ...............................................................................................................................5
2.0 FLOOD IMMUNITY............................................................................................................................6
3.0 STORMWATER DETENTION REQUIREMENT ................................................................................7
3.1 Broad-Brush Estimate of Required Detention Volume ...................................................................7
3.2 Hydrologic Model Set Up ...............................................................................................................7
3.3 Model Determination of the Required Detention Volume .............................................................10
3.4 Provision of Required Detention Volume .....................................................................................10
4.0 SUMMARY ......................................................................................................................................12
APPENDIX 1 - Reconfiguration of a Lot Layout plans .......................................................................... A
APPENDIX 2 - FLOOD CALCULATIONS ............................................................................................. D
3
2035 2 Pearsons Road – Flood Study September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.