Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix C - Flood Report_Sept2020

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                Callaghan & Toth




LIST OF FIGURES

Figure 1.1                    Site Location Plan……………………………………………………………....5
Figure 3.1                    URBS Model of the Pre-Development Catchment Condition………..8
Figure 3.2                    URBS Model Of the Post-Development Catchment Condition…………...9
Figure 3.3                    Proposed Stormwater Detention Facilities………………………………….11




LIST OF TABLES

Table 1             Predicted Peak Outflow Rates……………………..……………. ……………………..9
Table 2             Required Detention Volumes …………………….……………. ……………………..10




                                                                                                         4
2035 2 Pearsons Road – Flood Study                                                  September 2020
Log in to download the original file

Appendix C - Flood Report_Sept2020.pdf · 9.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.