42
43 .8 GENERAL NOTES
SEWER AND WATER NOTES DRAINS TO AVOID RISK OF BACKFLOW CONTAMINATION WHEREVER
43 .0
S
POSSIBLE. 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT
1. REFER HYDRAULIC DRAWINGS FOR INTERNAL DETAILS AND
43 .2 BLACKTOWN CITY COUNCIL AND SYDNEY WATER SPECIFICATIONS AND
43 .4
CONNECTIONS.
15. SEWER MUST MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 500MM STANDARDS.
42
43 .6
>
BELOW A WATER MAIN AND SHALL BE OFFSET BY A MINIMUM HORIZONTAL .8
2. REFER ARCHITECTURAL PLANS FOR DIMENSION SETOUT DETAILS. .8
S
CLEARANCE OF 1000mm. 2. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL
CP 6270
COMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS.
>
3. CONTRACTOR TO POT HOLE TO LOCATE ALL SERVICES AND CONFIRM
CP 2822
16. WATER MAINS ARE TO BE FLUSHED, CHLORINATED AND PRESSURE
4. 0
DEPTH PRIOR TO COMMENCING WORKS AND TO ENSURE THAT ALL NEW 4
10
2
4.44.
TESTED AFTER INSTALLATION. THE CONTRACTOR SHALL PROVIDE THE 3. ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
WORKS ARE IN ACCORDANCE WITH THE REQUIRED LEVELS. "
P10 P
S
RESULTS OF THESE TESTS TO THE SUPERINTENDANT PRIOR TO
00 4
U
>
' 4
4. ANY DISCREPANCIES BETWEEN THESE PLANS AND ARCHITECTURAL OR
ON-MAINTENANCE INSPECTIONS.
BU 8
4 m
°2 54 4.84 4.6 B 4. A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE
INSTALLED AT THE SERVICE POINT OF THELOT IN ACCORDANCE WITH THE
HYDRAULIC PLANS ARE TO BE REFERRED TO THE ENGINEER 17. CLEAN OUTS, INSPECTION OPENINGS AND CLOSING CAPS SITUATED IN 4 9.1 4.0
1 425 REQUIREMENTS OF SYDNEY WATER.
>
IMMEDIATELY.
S
445.
VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO BE FITTED WITH EITHER
BRASS OR CAST-IRON COVERS. . 5. ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.
5. ALL WORKS ASSOCIATED WITH LIVE SEWER OR WATER SERVICES AND 45
>
8
0
MAINTENANCE HOLES SHALL BE CARRIED OUT BY SYDNEY WATER OR AN
45.
46.
18. ALL IN-GROUND VALVES SHALL BE IN APPROVED CONCRETE PATH BOXES 6. THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON
155 .233m
APPROVED AND LICENSED CONTRACTOR AT THE PRINCIPAL
S
IN ACCORDANCE WITH THE AUTHORITIES REQUIREMENTS. THIS DRAWING MUST BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ
2
22
CONTRACTORS COST.
>
46.
°07
REGISTRATION. WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL
19. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS ARE TO BE NOT BE PERMITTED TO CONNECT TO THE RETICULATION SYSTEM
'40
4
6. THE MINIMUM GRADE FOR ALL SEWER PIPES SHALL BE WRAPPED IN AN APPROVED FLEXIBLE JOINT WRAPPING. PROPOSED NEW SEWER
46.
>
6.1. Ø100mm - 1 IN 60 HOUSE CONNECTION.
"
S
6.2. Ø150mm - 1 IN 150 CONNECTION LEVEL TO MATCH
20. ALL SERVICES ARE TO BE PROTECTED IN ACCORDANCE WITH THE
6.3. Ø225mm - 1 IN 290 EXISTING CONNECTION.
6
REQUIREMENTS OF THE AUTHORITY RESPONSIBLE FOR THE SERVICE.
>
46.
6.4. Ø300mm - 1 IN 420
21.
CP689
S
8
7. SEWERS HAVING GRADE EXCEEDING 1 IN 20 SHALL REQUIRE
46.
GTP
>
BULKHEADS/TRENCHSTOPS.
43.
.0
0
8. WHERE SEWERAGE IS TO CONNECT INTO EXISTING SEWER MAINS, THE
47
>
S
CONTRACTOR MUST VERIFY THE LOCATION AND LEVELS OF THE
CONNECTION POINT PRIOR TO COMMENCING WORKS.
.2
>
47
45.4
9. PIPE EMBEDMENT SHALL BE COMPACTED IN LAYERS NOT EXCEEDING EXISTING SEWER
S
300MM LOOSE DEPTH TO A MINIMUM 95% MAXIMUM COMPACTION AS PER CONNECTION TO CAPPED OFF.
>
AS 1289.
45.6
10. ALL SEWER AND MAINTENANCE STRUCTURES SHALL BE INSPECTED BY
45.8
S
>
CCTV AFTER ALL BACKFILLING OPERATIONS ARE SATISFACTORILY
0
46.
COMPLETED AND ALL JUNCTIONS INSTALLED. THE CONTRACTOR SHALL
2
46.
VERIFY THAT THE PIPE IS WITHOUT ANY CONSTRUCTION DEFECTS, THERE
43
T
4
>
46.
EN
ARE NO OBSTRUCTIONS TO FLOW AND ALL APPROVED JUNCTIONS ARE IN
.2
6
S
M
46.
THE RIGHT LOCATION. THE CONTRACTOR SHALL PROVIDE THIS
S E
8
INSPECTION TO THE AUTHORITY UPON REQUEST.
46.
BA
0
TO
47.
11. WHERE A SEWER IS TO BE CONSTRUCTED UNDER AN EXISTING OR
AY
2
47.
47.4
S
PROPOSED STORMWATER PIPE ≥ Ø375MM OR THROUGH AN UNLINED REFER TO ARCHITECTURAL
W
4
47.
OPEN DRAIN OR CHANNEL, THE SEWER IS TO BE CONCRETE ENCASED. E
IV PLANS FOR BUILDING DESIGN
6
DR
47.
ENCASEMENT SHALL EXTEND AT LEAST 1M EACH SIDE OF THE PIPE OR
8
CHANNEL WITH CLEARANCE TO OTHER SERVICES MEASURED FROM THE
47.
S S S
43.4
OUTSIDE OF THE ENCASEMENT.
0
48.
"
00
43.6
.96
2
48.
43.4
' 43
43.8
12. ALL SANITARY HYDRAULICS AND WATER RETICULATION IS TO BE IN 4
°2 8m
4
.63
48.
44.0
ACCORDANCE WITH AS3500, SYDNEY WATER SPECIFICATIONS AND 43
8
43.6
COMPLY WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING 4 2
44.2
6
48.
44.4
RELEVANT JURISDICTION.
44 .8
44 .0
43
44.6
44.4.2
44.6
45 .0 4.8
8
48.
47.6
13. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND
45.0
APPROVALS PRIOR TO COMMENCING WORK.
45 .2 4
4748.0.2
"
45 .8
'00
45.2
44
.8
0
4
49. 4 NOTE:
45.6.4
1°1 m
8 .4
48 8.6.8
14. WATER MAINS SHOULD ALWAYS CROSS OVER SEWER AND STORMWATER
45.4
4
24 9.15
48 .0.2
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
4
1
45.6
9
49 .4
49.2
IDENTIFY AND LOCATE ALL SERVICES ON SITE AND
4949.6.8
45.8
WITHIN THE WORKS AREA FOOTPRINT. WHERE ANY
45.8
49
DISCREPANCIES OCCUR BETWEEN THE INDICATED
46.0
46.0
49.4
POSITIONS AND LEVELS AND THE LOCATED SERVICES,
46.2
RECOR IS TO BE NOTIFIED AS SOON AS POSSIBLE.
46.4
46.2
NEW LARGE WATER METER
.32
46.6
WITHIN SITE. SIZE AND 49
46.4
46.8
METER ASSEMBLY TO BE
47.0
COORDINATED WITH
49.6
46.6
HYDRAULIC ENGINEER. LEGEND:
.87
49
46.8
47.2
EXISTING WATER METER 46.6 EXISTING CONTOURS
4
TO BE REMOVED.
49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Revised Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.