Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECT
ADJOINS INSET A L-SF-201
SHOTCRETE BY CIVIL
CONTRACTOR
PATH LOCATION TO BE
CONFIRMED ON SITE
GABION WALL BY CIVIL CONTRACTOR. F2
POSITIONED TO BE ALIGNED WITH PATH P1 F2
OR SIMILAR. TO BE CONFIRMED BY
ENGINEER
F2
KS
CLIENT
OR F2
F W
TO
F2
EN
P1
T
EX
LOOKOUT
F2
KEY PLAN
P9 B2
F2
B2
IL
UNC TIMBER DECKING
O B2
F2
EC
P11
Y
HI
R
DAR
S N LOOKOUT POOL B2 NOTES
OSA BOU AS PER DA 57
NO TE P9
F2
SI
B2
LEGEND
AN
Y DI
AR I RI BOULDER RETAINING WALL LOCATION
TO BE CONFIRMED BY ENGINEER B2
D V PA PLANTING AREA
F2
UN
BO B2
TY
UT UNDERCROFT TREATMENT AREA
ER
B2
OP
PR
RP REVEGETATION AREA ONLY BY
B2 OTHERS (NO GO ZONE)
B2
EXISTING VEGETATION TO BE
RETAINED. WEED MANAGEMENT AND
TURF TURF AS SPECIFIED
REVEGETATION PLANTING BY
DRAWINGS ADJOINS L-SF-204
LANDSCAPE CONTRACTOR WHERE
NECESSARY.
PAVEMENT TYPES - REFER TO
P-
SCHEDULE AND SPECIFICATION
TIMBER DECKING TO DRIVEWAYS
BY BUILDER.
THRESHOLD TREATMENT REFER
TO SPECIFICATION
PLANTING BETWEEN BACK OF EXISTING TREE TO BE RETAINED
KERB AND RETAINING WALL.
PA
NOTE: REFER ENGINEERS DETAILS AND
SPECIFICATION FOR ALL WALLS.
PA
PA GABION WALL AND
PA
DRAIN BY CIVIL
CONTRACTOR
PA
SHEET DETAILS
BIN ENCLOSURE BY ARCHITECT
UNDERCROFT TREATMENT BELOW
EXISTING DENSE VEGETATION 1m 0m 1m 2m 5m
STAIRS TO BE CONFIRMED ONSITE GABION WALL AND PA
AS PER DA CONDITION NO. 4 RETAINING WALL BY CIVIL
SCALE: 1:100 @ A1 size sheet
TIMBER DECKING TO DRIVEWAY BY DRAIN BY CIVIL CONTRACTOR
BUILDER TO ARCHITECTS CONTRACTOR
KOALA POLES TO BE LOCATED PA
SPECIFICIATION
TIMBER DECKING TO DRIVEWAY BY ALONG WALL AT 10m SPACINGS. SHOTCRETE WALL BY
KS
UNDERCROFT TREATMENT BELOW
BUILDER TO ARCHITECTS REFER TO SPECIFICATION. CIVIL CONTRACTOR Do not scale from this drawing.
GARAGE FOOTPRINT TO BE CONFIRMED Verify all dimensions on site prior to construction.
SPECIFICIATION All dimensions are in millimetres unless otherwise noted.
OR
ONSITE.
TIMBER DECKING TO DRIVEWAY BY AMENDMENT / ISSUE REGISTER
BUILDER TO ARCHITECTS
Issue Description Date Sign
W
SPECIFICIATION
PA PRELIMINARY REVIEW 28.11.07
UT RETAINING WALL UNDER BY
OF
P1 PRELIMINARY REVIEW 18.12.07
CIVIL CONTRACTOR TIMBER DECKING TO
DRIVEWAY BY BUILDER TO OP1 OPERATIONAL WORKS ISSUE 16.01.08
PA ARCHITECTS SPECIFICIATION OP1 OPERATIONAL WORKS ISSUE 01.02.08
NT
P2 PRELIMINARY REVIEW 05.02.08
GARAGE
TE
FFL 43.000 T1 TENDER ISSUE 06.02.08
PA
OP1 OPERATIONAL WORKS ISSUE 12.02.08
GARAGE
EX
UT FFL 43.000
DECK UT PA PA
FFL 37.470 GARAGE
PROJECT
FFL 42.800 UT
GARAGE
UT UT FFL 42.300 VIRIDIAN
UT STAGE 3
UT UT
UT
DECK
FFL 40.470
UT TITLE
UNDERCROFT TREATMENT
EXTENT TO BE CONFIRMED
ONSITE
SURFACE FINISHES
UT
1-101d
FFL 37.450 1-102a 1-103a SHOTCRETE WALL BY
CIVIL CONTRACTOR
PA
UT FFL 37.450 UT FFL 37.450
DRAWING INFORMATION
Design Drawn Date Scale Checked
DH JL 12.02.08 1:100
DRAWINGS AD
ADJOINS
AD L-SF-206 1-104a
FFL 37.450
Project No.
0551 2059.02
Drawing No.
L-SF-203
Issue
OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.