Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECT
CLIENT
KEY PLAN
NOTES
LEGEND
PA PLANTING AREA
UT UNDERCROFT TREATMENT AREA
DARY
EXISTING VEGETATION TO BE
PROPERTY BOUN
DRAWINGS ADJOINS L-SF-201
RETAINED. WEED MANAGEMENT AND
REVEGETATION PLANTING BY RP REVEGETATION AREA ONLY BY
LANDSCAPE CONTRACTOR WHERE OTHERS (NO GO ZONE)
NECESSARY.
DRAWINGS ADJOINS L-SF-212
TURF TURF AS SPECIFIED
PAVEMENT TYPES - REFER TO
BOUNDARY
P-
SCHEDULE AND SPECIFICATION
PROPERTY EXISTING GABION WALL
TIMBER DECKING TO DRIVEWAYS
BY BUILDER.
THRESHOLD TREATMENT REFER
S PA
WORK
TO SPECIFICATION
NT OF
EXTE PA
PA
EXISTING TREE TO BE RETAINED
EXISTING GABION WALL PA
NOTE: REFER ENGINEERS DETAILS AND
PA PA SPECIFICATION FOR ALL WALLS.
PA PA
BIN ENCLOSURE BY
ARCHITECT SHOTCRETE WALL BY
PA CIVIL CONTRACTOR SHEET DETAILS
PA VERTICAL BORED PIER WALL
PA GABION WALL AND BY CIVIL CONTRACTOR
UNDERCROFT TREATMENT BELOW TO BE
DRAIN BY CIVIL
CONFIRMED ONSITE CONTRACTOR
PA AC 1m 0m 1m 2m 5m
TIMBER DECKING TO DRIVEWAY BY BUILDER UNDERCROFT TREATMENT BELOW
SHOTCRETE WALL BY TO ARCHITECTS SPECIFICIATION SCALE: 1:100 @ A1 size sheet
CIVIL CONTRACTOR GARAGE FOOTPRINT TO BE CONFIRMED TIMBER DECKING TO DRIVEWAY
GABION WALL AND DRAIN BY ONSITE.
CIVIL CONTRACTOR BY BUILDER TO ARCHITECTS
TIMBER DECKING TO DRIVEWAY SPECIFICIATION
KOALA POLES TO BE LOCATED
BY BUILDER TO ARCHITECTS Do not scale from this drawing.
ALONG WALL AT 10m SPACINGS. TIMBER DECKING TO DRIVEWAY BY Verify all dimensions on site prior to construction.
SPECIFICIATION
REFER TO SPECIFICATION. BUILDER TO ARCHITECTS SPECIFICIATION All dimensions are in millimetres unless otherwise noted.
AMENDMENT / ISSUE REGISTER
RETAINING WALL UT Issue Description Date Sign
UNDERNEATH BY CIVIL
PA PRELIMINARY REVIEW 28.11.07
TIMBER DECKING TO DRIVEWAY CONTRACTOR PA
UT UT P1 PRELIMINARY REVIEW 18.12.07
BY BUILDER TO ARCHITECTS UT
SPECIFICIATION OP1 OPERATIONAL WORKS ISSUE 16.01.08
UT PA GARAGE PA
TIMBER DECKING TO DRIVEWAY OP1 OPERATIONAL WORKS ISSUE 01.02.08
FFL 42.400
BY BUILDER TO ARCHITECTS P2 PRELIMINARY REVIEW 05.02.08
SPECIFICIATION UT
T
UT T1 TENDER ISSUE 06.02.08
PA GARAGE
UT OP1 OPERATIONAL WORKS ISSUE 12.02.08
FFL 43.000
UT
PA
GARAGE
UT FFL 43.600 PROJECT
PA UT
UT GARAGE
UT
VIRIDIAN
FFL 44.100
STAGE 3
GARAGE
FFL 44.200
UT
GARAGE TITLE
FFL 44.400
UT
SURFACE FINISHES
GARAGE
3-106a UT 3-107a 3-108a FFL 40.000
FFL 41.000 FFL 40.500 FFL 40.000
DRAWING INFORMATION
Design Drawn Date Scale Checked
3-105a DH JL 12.02.08 1:100
FFL 41.000 DRAWINGS ADJOINS L-SF-205 Project No.
0551 2059.02
Drawing No.
L-SF-202
Issue
OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.