Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECT
CLIENT
KEY PLAN
NOTES
LEGEND
S
F W ORK PA PLANTING AREA
XT ENT O ONE PA
E OZ
DRAWINGS ADJOINS L-SF-218
UT UNDERCROFT TREATMENT AREA
GABION WALL AND
NO G
DRAIN BY CIVIL RP REVEGETATION AREA ONLY BY
CONTRACTOR OTHERS (NO GO ZONE)
TURF TURF AS SPECIFIED
SHOTCRETE WALL BY
PAVEMENT TYPES - REFER TO
CIVIL CONTRACTOR P-
SCHEDULE AND SPECIFICATION
PA PA TIMBER DECKING TO DRIVEWAYS
BY BUILDER.
EXISTING VEGETATION TO BE
RETAINED. WEED MANAGEMENT AND
REVEGETATION PLANTING BY THRESHOLD TREATMENT REFER
TIMBER DECKING TO TO SPECIFICATION
LANDSCAPE CONTRACTOR WHERE
DRIVEWAY BY BUILDER TO
NECESSARY.
AC ARCHITECTS SPECIFICIATION
EXISTING TREE TO BE RETAINED
CONCRETE RETAINING WALL
BY CIVIL CONTRACTOR
PA UNDERCROFT TREATMENT TIMBER DECKING TO DRIVEWAY
BELOW GARAGE FOOTPRINT TO NOTE: REFER ENGINEERS DETAILS AND
BY BUILDER TO ARCHITECTS SPECIFICATION FOR ALL WALLS.
BE CONFIRMED ONSITE. SPECIFICIATION
TIMBER DECKING TO DRIVEWAY BY
BUILDER TO ARCHITECTS
SPECIFICIATION UT
Y
AR UT SHEET DETAILS
ND
BIN ENCLOSURE BY PA GARAGE
U ARCHITECT FFL 53.000
BO
R TY SHOTCRETE WALL BY
TIMBER DECKING TO DRIVEWAY
BY BUILDER TO ARCHITECTS
UT 1m 0m 1m 2m 5m
E
OP
SCALE: 1:100 @ A1 size sheet
CIVIL CONTRACTOR SPECIFICIATION UT
PR KOALA POLES TO BE LOCATED PA GARAGE
ALONG WALL AT 10m SPACINGS. Do not scale from this drawing.
FFL 53.500 Verify all dimensions on site prior to construction.
REFER TO SPECIFICATION. All dimensions are in millimetres unless otherwise noted.
AMENDMENT / ISSUE REGISTER
UT Issue Description Date Sign
UT
KS
PA PRELIMINARY REVIEW 28.11.07
5-106c P1 PRELIMINARY REVIEW 18.12.07
OR AC
PA GARAGE
FFL 54.000
FFL 51.000 OP1 OPERATIONAL WORKS ISSUE 16.01.08
W
OP1 OPERATIONAL WORKS ISSUE 01.02.08
PA
P2 PRELIMINARY REVIEW 05.02.08
OF T1 TENDER ISSUE 06.02.08
T PA
5-105c
OP1 OPERATIONAL WORKS ISSUE 12.02.08
TEN GARAGE FFL 51.500
EX
FFL 54.500 PROJECT
CONCRETE RETAINING UNDERCROFT TREATMENT
BELOW TO BE CONFIRMED
WALL BY CIVIL
CONTRACTOR
UT ONSITE VIRIDIAN
EXISTING GABION WALL TIMBER DECKING TO UT
5-104c
UT STAGE 3
DRIVEWAY BY DECK
BUILDER TO FFL 52.000 FFL 51.000
ARCHITECTS
SPECIFICIATION
UT TITLE
UT
5-103c UT
SURFACE FINISHES
FFL 52.500 PA
PA DECK
FFL 51.500
PA
GARAGE
UT
FFL 55.000
DRAWING INFORMATION
Design Drawn Date Scale Checked
5-102c DECK DH JL 12.02.08 1:100
FFL 53.000
DRAWINGS ADJOINS L-SF-215 FFL 52.000 Project No.
0551 2059.02
Drawing No.
L-SF-217
Issue
OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.