LANDSCAPE ARCHITECT
CLIENT
CONCRETE PATH TO CONNECT TO
EXISTING BUGGY PATH. FINISH TO
MATCH EXISTING.
KOALA POLES TO BE LOCATED EX
EXTENT OF WORKS ALONG WALL AT 10m SPACINGS.
REFER TO SPECIFICATION.
TE
NT KEY PLAN
NO GO ZONE OF
W OR
KS
PA
NOTES
PA P5 PA
BIN ENCLOSURE BY LEGEND
ARCHITECT
PA SHOTCRETE WALL BY B1
TIMBER DECKING TO CIVIL CONTRACTOR
DRIVEWAY BY BUILDER TO RP
ARCHITECTS SPECIFICIATION PA PLANTING AREA
P7 B1
ADJOINS L-SF-217
AC
SHOTCRETE WALL BY CONCRETE RETAINING WALL
TIMBER BOARDWALK
CIVIL CONTRACTOR BY CIVIL CONTRACTOR
AND STAIRS B1
UT UNDERCROFT TREATMENT AREA
B1
RP REVEGETATION AREA ONLY BY
B1
OTHERS (NO GO ZONE)
B3
AC
PA
TURF TURF AS SPECIFIED
B3
P3
B1
B3
PAVEMENT TYPES - REFER TO
UT P-
SCHEDULE AND SPECIFICATION
B3
GARAGE PA TIMBER DECKING TO DRIVEWAYS
B1
FFL 51.500 BY BUILDER.
DRAWINGS
B3
THRESHOLD TREATMENT REFER
B3
PA GARAGE TO SPECIFICATION
UT
RAWI
FFL 52.300
B1
PA
B3
EXISTING TREE TO BE RETAINED
UT
D
GARAGE
B1
FFL 52.500 5-108e
FFL 48.500 RP NOTE: REFER ENGINEERS DETAILS AND
UT PA SPECIFICATION FOR ALL WALLS.
B1
VERTICAL GABION EARTH
REINFORCED WALL BY CIVIL
CONTRACTOR
B1
SHEET DETAILS
NE KS
Z O OR
DECK B1 1m 0m 1m 2m 5m
FFL 48.500
5-107c BY ENGINEER TO SCALE: 1:100 @ A1 size sheet
GO F W
TOP OF WALL
FFL 50.800
B1
NO NT O
UNDERCROFT TREATMENT BELOW Do not scale from this drawing.
DECK UT EXISTING VEGETATION TO BE Verify all dimensions on site prior to construction.
TO BE CONFIRMED ONSITE FFL 48.500 UT All dimensions are in millimetres unless otherwise noted.
PROTECTED AND RETAINED.
DECK AMENDMENT / ISSUE REGISTER
PROTECTIVE AND SITE FENCING TO BE
TE
FFL 46.970 Issue Description Date Sign
CONSTRUCTED BY BUILDER.
EX
PA PRELIMINARY REVIEW 28.11.07
5-106c P7 AC P1 PRELIMINARY REVIEW 18.12.07
FFL 51.000 UT
OP1 OPERATIONAL WORKS ISSUE 16.01.08
UT RETAINING WALL BY CIVIL
CONTRACTOR OP1 OPERATIONAL WORKS ISSUE 01.02.08
PA UT P2 PRELIMINARY REVIEW 05.02.08
T1 TENDER ISSUE 06.02.08
TIMBER DECKING TO
OP1 OPERATIONAL WORKS ISSUE 12.02.08
DRIVEWAY BY BUILDER TO
DECK ARCHITECTS SPECIFICIATION
FFL 50.800
P7 PROJECT
UNDERCROFT TREATMENT
PA
BELOW GARAGE FOOTPRINT VIRIDIAN
AC TO BE CONFIRMED ONSITE.
GARAGE STAGE 3
FFL 47.000
RP
6-109f
UT FFL 44.000 TITLE
UT
P7 GARAGE
FFL 46.500 UT
SURFACE FINISHES
DECK DRAWING INFORMATION
FFL 43.970 Design Drawn Date Scale Checked
DH JL 12.02.08 1:100
GARAGE
DRAWINGS
AW
AW ADJOINS L-SF-216 Project No.
0551 2059.02
Drawing No.
L-SF-218
Issue
OP1
FFL 45.500
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.