Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECT
CLIENT
B1
KEY PLAN
B1
B1
B1
B1
B3
B3
B1
B3
B3
GARAGE
B1
FFL 51.500
B3
B3
GARAGE
FFL 52.300
B1
B3
GARAGE
B1
FFL 52.500 5-108e NOTES
FFL 48.500
B1
RY
DA
B1
GARAGE
UN FFL 53.000
Y BO LEGEND
E RT DECK B1
OP
FFL 48.500
5-107c
PR FFL 50.800
GARAGE B1
FFL 53.500
DECK
FFL 48.500
X GRAVEL SWALE
DECK
FFL 46.970
LD-9XX REFER TO DETAIL
GARAGE
5-106c
FFL 51.000
FFL 54.000
X RUBBLE PIT
5-105c DECK
LD-9XX REFER TO DETAIL
GARAGE FFL 51.500 FFL 50.800
FFL 54.500
5-104c GARAGE
FFL 52.000
DECK
FFL 51.000
FFL 47.000
NOTE: LOCATION OF GRAVEL SWALE TO CONTROL
6-109f EROSION OF ROOF WATER RUNOFF.
FFL 44.000
5-103c GARAGE
FFL 46.500 DOWNPIPE AND GUTTER RUNOFF CONFIRMED BY
FFL 52.500
DECK
FFL 51.500
ARCHITECT. LOCATION OF SWALE AND RUBBLE PITS TO
GARAGE
FFL 55.000
BE CONFIRMED ON SITE.
DECK
FFL 43.970
5-102c DECK
FFL 53.000 FFL 52.000
GARAGE
FFL 45.500
DECK
FFL 52.500
6-108g
FFL 45.000
DECK
SW2
FFL 53.000
GARAGE
FFL 45.300
SW DECK
2 FFL 44.970
5-101c
FFL 53.500
S W2 6-107h
FFL 44.000
SW GARAGE
2
FFL 45.000
DARY
SW
2
6-106c
BOUN
DECK
FFL 43.970
FFL 43.800
GARAGE
ERTY
DECK FFL 45.000
FFL 53.500
PROP
SW DECK
2
6-105c FFL 43.770
FFL 43.500
SW
2
6-104c
FFL 43.500
GARAGE
FFL 45.000
DECK
FFL 43.470
SHEET DETAILS
MEETING
ROOM
FFL 42.700
DECK
FFL 43.470
2.5m 0m 2.5m 5m 12.5m
6-103c
GARAGE FFL 43.500
FFL 43.500 SCALE: 1:250 @ A1 size sheet
DARY
BOUN
Do not scale from this drawing.
DECK
Verify all dimensions on site prior to construction.
ERTY
FFL 43.470 All dimensions are in millimetres unless otherwise noted.
SW
1
AMENDMENT / ISSUE REGISTER
PROP
GARAGE
FFL 43.500 Issue Description Date Sign
6-102c
LAP POOL FFL 42.000
FFL 45.470
P1 PRELIMINARY REVIEW 18.12.07
OP1 OPERATIONAL WORKS ISSUE 16.01.08
DECK OP1 OPERATIONAL WORKS ISSUE 01.02.08
FFL 41.970
CARPARK
FFL P2 PRELIMINARY REVIEW 05.02.08
T1 TENDER ISSUE 06.02.08
6-101c OP1 OPERATIONAL WORKS ISSUE 12.02.08
FFL 42.000
PROJECT
SW
1 DECK
AR
Y SW
FFL 41.970
VIRIDIAN
ND
1
ER
TY
B OU
STAGE 3
OP
PR
SW
1
HEALTH SPA
BASEMENT FFL 39.500
TITLE
SSD
ROOF WATER RUNOFF
STABILISATION PLAN
SS
D
SW1
1
SW
HEALTH SPA
BASEMENT FFL 39.500
SSD
RY
BOUNDA
PERTY DRAWING INFORMATION
1
SW
SSD
Design Drawn Date Scale Checked
DH JL 12.02.08 1:250
DRAWINGS ADJOINS L-SSP-702 Project No. Drawing No. Issue
SW1
0551 2059.02 L-SFP-703 OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.