Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Viridian Stage 3 Documentation A3 [As Published] · 142008.256

of 55

Text shows just the words. Original shows the document exactly as it was published.

Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 46, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                    LANDSCAPE ARCHITECT




                                                                        HWD STAKES AS SPECIFIED. MIN.
                                                                        2 No. PER TREE. ENSURE
                                                                        STAKES ARE FIRMLY SECURED
                                                                        MIN 600mm INTO GROUND.
                                                                                                                                                                                                    CLIENT
                                                                                                                                                                     HWD STAKES AS SPECIFIED.
                                                                                                                                                                     MIN. 2 No. PER TREE. ENSURE
                                                                                                                                                                     STAKES ARE FIRMLY SECURED
                                                                                                                                                                     MIN 600mm INTO GROUND.


                                                                                                                                                                     50mm WIDE GREEN RECYCLED
                                                                                                                                                                     TIE AS SPECIFIED
                                                                        50mm WIDE GREEN RECYCLED
                                                                        TIE AS SPECIFIED
                                                                                                                                                                     100mm LAYER OF MULCH AS
                                                                        100mm LAYER OF MULCH AS                                                                      SPECIFIED. KEEP MULCH CLEAR
                                                                        SPECIFIED. KEEP MULCH CLEAR                                                                  FROM TRUNK OF TREE. MULCH      KEY PLAN
                                                                        FROM TRUNK OF TREE. MULCH                                                                    TO BE FLUSH WITH
                                                                        TO BE FLUSH WITH                FOOTPATH AND SUB SURFACE                                     SURROUNDING MULCH LEVELS
                                                                        SURROUNDING MULCH LEVELS               AGGREGATE BY CIVIL                                    IN GARDEN BED.
                                                                        IN GARDEN BED.                         CONTRACTOR OR AS
                                                                                                             SPECIFIEED. REFER TO                                    KERB BY CIVIL CONTRACTOR
                                                                        BACKFILL TREE PIT WITH             SURFACE FINISHES PLAN.
                                                                        MODIFIED SITE TOPSOIL AS
                                                                        SPECIFIED. FORM SHALLOW
                                                                        BERM TO TRUNK FOR WATER
                                                                        RETENTION. TOPSOIL TO
                                                                        EXTEND MIN 300mm DEEP
                                                                        THROUGH GARDEN BED AS
                                                                                                                                                                                                    NOTES
                                                                        SPECIFED

                                                                        150mm CULTIVATED SUBGRADE
                                                                                                             BACKFILL TREE PIT WITH
                   min.
             300                                                                                           MODIFIED SITE TOPSOIL AS                     min.         EXCAVATE EACH TREE PIT TO
                                                                        EXCAVATE EACH TREE PIT TO         SPECIFIED. FORM SHALLOW                 300
                                                                                                                                                                     ALLOW FOR MIN 1m3 OF SITE
                                                                        ALLOW FOR MIN 1m3 OF SITE        BERM TO TRUNK FOR WATER                                     TOPSOIL TO BE INSTALLED.
                                                                        TOPSOIL TO BE INSTALLED.             RETENTION. TOPSOIL TO                                   TREE PIT MUST BE MIN 300
                                                                        TREE PIT MUST BE MIN 300            EXTEND MIN 300mm DEEP                                    LARGER THAN ROOT BALL ON
                                        300




                                                                                                                                                               300
                                                                        LARGER THAN ROOT BALL ON           THROUGH GARDEN BED AS                                     ALL SIDES.
                                                                        ALL SIDES.                                        SPECIFED
150




                                                                        CULTIVATE SUBGRADE TO MIN.




                                                                                                                                      150
                                                                        150mm DEPTH.                                                                                 CULTIVATE SUBGRADE TO MIN.
                                                                                                                                                                     150mm DEPTH.
                                                                        SUBGRADE AS PROFILED BY
                                                                                                                                                                     SUBGRADE AS PROFILED BY
                                                                        CIVIL CONTRACTOR
                                                                                                                                                                     CIVIL CONTRACTOR



             TYPICAL TREE PLANTING IN GARDEN BED                                                                           TYPICAL TREE ADJACENT PAVEMENT
      1      SCALE 1:20                                                                                            2       SCALE 1:20




                                                                                                           HWD STAKES AS SPECIFIED. MIN. 2 No. PER
                                                                                                           TREE. ENSURE STAKES ARE FIRMLY
                                                                                                           SECURED MIN 600mm INTO GROUND.

                                                                                                                                                                                                    SHEET DETAILS

                                                                                                           50mm WIDE GREEN RECYCLED TIE AS
                                                                                                           SPECIFIED
                                                                                                                                                                                                    2m          0m      2m       4m                       10m
       SPADE CUT EDGE TO TREE PITS
         WHERE SPECIFIED. REFER TO                                                                         100mm LAYER OF MULCH AS SPECIFIED.
                                                                                                                                                                                                        SCALE: 1:200   @ A1 size sheet
            SURFACE FINISHES PLAN                                                                          KEEP MULCH CLEAR FROM TRUNK OF TREE.
                                                                                                           MULCH TO BE FLUSH WITH SURROUNDING
                                                                                                           MULCH LEVELS IN GARDEN BED.
                                                                                                                                                                                                    Do not scale from this drawing.
       TURF AS SPECIFIED. MIN 100mm                                                                        BACKFILL TREE PIT WITH MODIFIED SITE                                                     Verify all dimensions on site prior to construction.
                                                                                                           TOPSOIL AS SPECIFIED. FORM SHALLOW                                                       All dimensions are in millimetres unless otherwise noted.
         TOPSOIL TO TURF AREAS AS
                          SPECIFIED                                                                        BERM TO TRUNK FOR WATER RETENTION.                                                       AMENDMENT / ISSUE REGISTER
                                                                                                           TOPSOIL TO EXTEND MIN 300mm DEEP                                                        Issue        Description                              Date       Sign
                                                                                                           THROUGH GARDEN BED AS SPECIFED

                                                                                                           KERB BY CIVIL CONTRACTOR                                                                P1           PRELIMINARY REVIEW                       18.12.07
                                                                                                                                                                                                   OP1          OPERATIONAL WORKS ISSUE                  16.01.08
                                                                                                                                                                                                   OP1          OPERATIONAL WORKS ISSUE                  01.02.08
                                                                                                                                                                                                   P2           PRELIMINARY REVIEW                       05.02.08
                                                                                                                                                                                                   T1           TENDER ISSUE                             06.02.08
                                                                                                                                                                                                   OP1          OPERATIONAL WORKS ISSUE                  12.02.08
                                                             300 min.

                    SERVICES BY CIVIL                                                                      ROOT BARRIER TYPE ReR1000 AS SPECIFIED.
                       CONTRACTOR                                                                          ROOT BARRIER TO BE 1M DEEP AND SET MIN                                                   PROJECT
                                                                                                           300mm FROM ROOTBALL. INSTALL AS PER

      ROOT BARRIER TYPE ReR1000 AS
                                                                                                           MANUFACTURERS SPECIFICATION.
                                                                                                                                                                                                    VIRIDIAN
                                                                                                           EXCAVATE EACH TREE PIT TO ALLOW FOR                                                      STAGE 3
                                                                                      300 min.




      SPECIFIED. ROOT BARRIER TO BE
         1M DEEP AND SET MIN 300mm                                                                         MIN 1m3 OF SITE TOPSOIL TO BE INSTALLED.
         FROM ROOTBALL. INSTALL AS                                                                         TREE PIT MUST BE MIN 300 LARGER THAN
               PER MANUFACTURERS                                                                           ROOT BALL ON ALL SIDES.
                     SPECIFICATION.
                                                       150




                                                                                                           CULTIVATE SUBGRADE TO MIN. 150mm
                                                                                                           DEPTH.                                                                                   TITLE

                                                                                                           SUBGRADE AS PROFILED BY CIVIL
                                                                                                           CONTRACTOR
                                                                                                                                                                                                    DETAILS

                                         TYPICAL TREE WITH ROOT BARRIER
                                    3     SCALE 1:20
                                                                                                                                                                                                    DRAWING INFORMATION
                                                                                                                                                                                                   Design               Drawn            Date          Scale        Checked
                                                                                                                                                                                                   DH                   JL               12.02.08      1:200
                                                                                                                                                                                                    Project No.                          Drawing No.                Issue

                                                                                                                                                                                                   0551 2059.02                          L-DT-901                   OP1

Used in these records

About this file

File size
63.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Viridian Stage 3 Documentation A3 [As Published].pdf · 63.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.