Council archive · source document
001511C5.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
column 1 . tere) (i 4 Column 3 , 7
Specific Outcomes Probable solutions (if code assessable) Compliance
k i 5
$7.3 For power lines that connect to a premises,
the height of plant species at maturity provides for a
2m clearance below the power line; (see Figure -3)
Figure -3
Gm ar
Cosas, “Hele
. Yor rf
$7.4 Trees and large scrubs are located a
minimum of—
a) 5m from electricity poles and pillars;
b) 4m from street lamps;
c) 2m from stormwater catchment pits; and
d) 2m from underground services and utilities;
AND ‘
$7.5 Plants are located to enable tradespersons to
access, view and inspect service meters, such as
water and electricity meters,
AND
$7.6 Root barriers are installed around trees thatSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001511C5.001.pdfRelated documentPublic source context ↗
07/0799 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.