20210216 RECOR Further Advice Response
iii. demonstrate the existing branch connections across the
existing stormwater line have sufficient depth to maintain
existing freeboard in the system.
b. If forgoing the reconstruction of the chamber:
i. Demonstrate a suitable driveway crossover location that
complies with relevant standards and will not adversely
affect Council’s existing stormwater infrastructure.
We recommend that these be conditioned in the Operational Works permit to detail
the reconstruction of the chamber using a Class D manhole.
We believe that the above satisfactorily addresses the engineering matters raised
however, should additional information be required, please contact our office directly.
Yours faithfully,
RECOR Pty Ltd
Prepared by
Jaro Bauleka
Civil Engineer
RPEQ: 20693
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com