Skip to the record
Every meeting, every word.

Original source · versioned page text

20210216 RECOR Further Advice Response

of 3

Page text shows just the words. Original shows the document exactly as it was published.

            Figure 2 Extract from RS-049


            This is generally in accordance with the relevant Standard Drawings. We recommend
            that this be conditioned in the Operational Works permit to detail the modified Type
            A wing for the heavy-duty crossover.


            Existing Stormwater Chamber
               2. Provide additional detail demonstrating how the proposed development
                   will ensure the existing stormwater chamber will not be traversed, unless
                   reconstructed with a Class D manhole lid. The detail must be prepared by a
                   suitably qualified person (RPEQ – Registered Professional Engineer of
                   Queensland) and include, but not be limited to:


                      a. If proceeding with the reconstruction of the chamber:
                              i. reconstruct the existing gully chamber as a manhole with a
                                 Class D lid;
                             ii. construct a branch line connection to the newly constructed
                                 gully pit sufficiently clear from the driveway entrance; and




P +61 7 5211 1003       A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

20210216 RECOR Further Advice Response.pdf · 139 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.