20210216 RECOR Further Advice Response
Figure 2 Extract from RS-049
This is generally in accordance with the relevant Standard Drawings. We recommend
that this be conditioned in the Operational Works permit to detail the modified Type
A wing for the heavy-duty crossover.
Existing Stormwater Chamber
2. Provide additional detail demonstrating how the proposed development
will ensure the existing stormwater chamber will not be traversed, unless
reconstructed with a Class D manhole lid. The detail must be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland) and include, but not be limited to:
a. If proceeding with the reconstruction of the chamber:
i. reconstruct the existing gully chamber as a manhole with a
Class D lid;
ii. construct a branch line connection to the newly constructed
gully pit sufficiently clear from the driveway entrance; and
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.