IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTACT THE RELEVANT
AUTHORITIES TO CONFIRM THE LOCATION OF
ALL EXISTING SERVICES PRIOR TO THE
COMMENCEMENT OF EXCAVATION
SURFACE FLOW DIRECTED LEVEL SPREADER
TO SEDIMENT TRAP PROVIDE 150mm WIDE CONCRETE
EDGING TO PERIMETER
OR APPROVED EQUIVALENT.
600 X 600 SEALED PIT
LEVEL SPREADER PROVIDE GRATED IOS
1000mm CONCRETE EDGING ON EACH END.
200mm AGGREGATE LAYER. PROVIDE ATLANTIS MATRIX CELLS.
d50 = 50mm PART NO. 70003 (SINGLE)
DETAILS TO BE CONFIRMED OR APPROVED EQUIVALENT DETAILS.
REFER MANUFACTURERS SPECIFICATIONS.
CAPPED Ø150 STORMWATER
TANK INLET PIPE
CONNECTION FOR DRIVEWAY
AND SURFACE WATER
700mm
700mm
REFER TO INFILTRATION
TRENCH DETAIL
SEDIMENT TRAP
5000mm INLET PIPE
PROVIDE Ø100 SLOTTED PIPE THROUGH CELLS
INLET PIPE
GEOFABRIC
SECTION A TYPICAL INFILTRATION TRENCH DETAIL
SCALE 1:40 (A3)
STORMWATER DRAINAGE NOTES
BDY
1. ALL STORMWATER DRAINAGE TO BE CONSTRUCTED IN ACCORDANCE WITH SECTION 6.7.5 OF
NOOSA SHIRE PLANNING SCHEME POLICY FOR DEVELOPMENT WORKS AND COUNCIL's
STANDARD DRAWINGS.
2. ALL PVC-U STORMWATER PIPES TO BE CLASS SN8 U.N.O.
3. ALL PP (STORMPRO) PIPES TO BE CLASS SN8 U.N.O.
600mm 500mm
4. ALL STORMWATER PIPES TO BE RUBBER RING JOINTED.
5. FINAL LID AND GRATE LEVELS OF MANHOLES AND PITS TO BE ADJUSTED ON SITE TO SUIT ALL
EARTHWORKS AND FINISHED SURFACE LEVELS.
PROVIDE APPROVED KERB
6. PIPE BEDDING AND BACKFILL SHALL BE IN ACCORDANCE WITH SPECIFICATION FOR PVC-U PIPES ADAPTERS IN ACCORDANCE WITH
AND SPECIFICATION FOR R.C. PIPES. IPWEA STD DWG RS-081
450mm
1 IN 4 TURFED BATTER
7. MAINTENANCE HOLES TO BE CONSTRUCTED IN ACCORDANCE WITH THE INSTITUTE OF PUBLIC
WORKS ENGINEERING AUSTRALIA QUEENSLAND DIVISION's (IPWEA) DRG. No.'s DS-010, 015,
018, 019, 020 AND 021.
8. TYPE 2 BEDDING TO BE USED TO ALL STORMWATER PIPES UNLESS NOTED OTHERWISE.
9. EXCAVATION, BEDDING AND BACKFILL OF STORMWATER PIPES TO BE IN ACCORDANCE WITH 3 - Ø100 CL 12 u-PVC
IPWEA DRG. No. DS-030.
SCALE 1:10 (A1) - 1:20 (A3)
10. ALL FIELD INLETS TO BE TYPE 2 IN ACCORDANCE WITH IPWEA DRG. No. DS-050 UNLESS NOTED PROVIDE BENCHING
OTHERWISE. ROOF WATER
CONNECTION
11. REFER TO MANUFACTURER'S SPECIFICATION FOR INSTALLATION OF GROSS POLLUTANT TRAPS. STORMWATER CROSSOVER DETAIL SCALE 1:20 (A1) - 1:40 (A3)
SCALE 1:20 (A3)
12. UNLESS NOTED OTHERWISE, A MINIMUM COVER OF 600mm SHALL BE MAINTAINED OVER ALL
STORMWATER PIPES UNDER ROADWAYS AND A MINIMUM COVER OF 450mm SHALL BE
MAINTAINED FOR ALL INTERALLOTMENT DRAINAGE. Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
13. CONTRACTOR TO MAINTAIN A 1.0m CLEARANCE WITH INTERALLOTMENT STORMWATER PIPES Check Building Boundary clearances by set out.
TO SEWER MAINS (O.D. TO O.D.)
Notwithstanding the information supplied on this drawing,
14. STORMWATER FLOWS ON PLAN ARE BASED ON PEAK FLOW RATES
the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
Approved
Checked - CSC
Consulting Civil & Drawing title - Project - RESIDENTIAL SUBDIVISION Site - Project No. 213029 Sheet No. C301
Design - AG Drawn - TW Structural Engineers STORMWATER DETAILS 41 PICTURE POINT CRESCENT, Digital Ref :
C300 STORMWATER
MANAGEMENT PLAN Issue : A
Scales - AS SHOWN Project Management 124 DUPORTH AVENUE Ph (07) 5443 7777 Client -
MRS. HEIDI MEYER NOOSA HEADS, QLD This Document is copyright and shall not be copied
ASSOCIATES PTY LTD PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - APPROVAL
A 09.03.23 RFI RESPONSE TW
& Planning MAROOCHYDORE QLD 4558
for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
C:\12dS\data\12DSERVER\213029_1964\DWG Covey\Civil\Uncontrolled\C300 STORMWATER MANAGEMENT PLAN.dwg Plot 10 March 2023 - 3:36 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Reporting.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.