            Corrective             In the event that practices are inconsistent with the strategies outlined in this FMP, the
            action                 contractor should take the corrective steps and report non-compliance to the relevant
                                   personnel.
                                   The Tusked frog requires maintenance of suitable pond or stream conditions for its
                                   continual successful breeding. If vegetation clearing impacts on the watercourses,
                                   corrective actions must be taken immediately to minimize potential adverse impacts.

            Timing                 The duration of the construction period.




                4.2.           Vegetation Clearing
           Clearing of native vegetation can result in the direct injury or death of fauna. Clearing of the vegetation
           on Site can also damage fauna habitat within retained vegetation. Grubbing can have additional soil
           degradation impacts. Disturbing the soil by removing roots and ground cover will leave it exposed to
           the elements and potentially increase erosion towards the watercourse. Exposed soil can also change
           in structure, and sedimentation into the waterway can alter water quality. Further information regarding
           soil disturbance, Site stabilisation, and erosion controls is provided in the RMP.

           Table 4. Strategies to manage the impacts of vegetation clearing

            Issue                  Fauna habitat and vegetation clearing

            Management             Reduce direct and indirect effects on fauna during the clearing processes.
            objective

            Requirements           Clearing shall only occur once all approvals have been granted.
            to implement
                                   Before works:
                                       •   All personnel are to attend a pre-start meeting and be familiar with this FMP.
                                       •   Everyone involved in the construction will be instructed on their duties in relation
                                           to vegetation clearing protocols and protecting native fauna. Areas intended for
                                           vegetation clearing should be clearly defined and notified in detail.
                                       •   The Vegetation Protection Zone/s (VPZ) are to be clearly delineated.
                                       •   All erosion controls must be in place to reduce sedimentation into the
                                           watercourses.
                                       •   A suitably qualified FSC is to undertake a Pre-Clearance survey prior to each
                                           day of clearing works. The FSC is to record all data pertaining to wildlife
                                           interactions and clearly indicate all habitat features (i.e., with use of spray paint
                                           or high-visibility flagging tape).
                                   During works:
                                       •   All clearing is to be carried out in the presence of a suitably qualified FSC who
                                           has the primary role of safely capturing and relocating fauna impacted by works.
                                       •   Removal of understory and scrub trees is to be conducted first, followed by the
                                           removal of non-habitat trees.
                                       •   Non-habitat trees and coarse woody debris should be stockpiled.
                                       •   Clearing of non-habitat trees will only occur where their removal will not impact
                                           on identified habitat trees (e.g. canopies do not interconnect with habitat trees).
                                       •   Hollows within trees will be identified in the field before commencing clearing.
                                           These will be marked for inspection and may require dismantling using a
                                           qualified arborist and a cherry picker or elevated work platform (EWP).

           FAUNA MANAGEMENT PLAN | Summit Road, Pomona
                                                                                                                                   19


Document Set ID: 22570982
Version: 1, Version Date: 05/09/2023
Log in to download the original file

Approved Plan - OPW230084.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.