• Rehabilitate and maintain the western waterway. Ensure that any fences
erected in relation to this feature do not impede the movement of aquatic
fauna.
• Place any salvageable hollow tree limbs and other habitat features outside of
the clearing area to provide additional habitat:
o Suitable tree logs and root balls (above 400mm) that can be used as
habitat should be stockpiled and placed in covenant zone under the
direction of Site ecologist.
o Any Class 1 hardwood logs above 400mm diameter should be made
available to salvage for milling and used to build nest boxes. Biodiverse
Environmental can take suitable logs free of charge for this purpose.
• Contractors must adhere to all clearing boundaries and No-Go Zones.
Personnel Base Architecture are responsible for:
responsible
• Ensuring all contractors understand the expectations that hollow trees, coarse
woody debris and large rocks will be stockpiled for future placement within
retained habitat.
• Ensuring management of any erosion or sedimentation risks.
• Complying with all approval conditions of the Development Application
pertaining to habitat rehabilitation and landscaping.
The Clearing Contractor is responsible for:
• Working with the Fauna Spotter Catcher to relocate hollow trees, logs and
rocks.
The FSC / Ecologist is responsible for:
• Identifying habitat features for relocation.
• Communicating with other contractors to facilitate relocation of habitat.
• Determining the final quantity and type of nest boxes to be installed.
• Identifying suitable nest box host trees in retained habitat. The eastern extent
of the Site contains suitable host trees.
• Undertaking monitoring of nest boxes at the nominated time periods.
Reporting and If nest boxes are to be installed, the FSC / Ecologist is to provide a summary report
auditing detailing nest box installation, and subsequent reports detailing nest box monitoring
events.
Corrective Replacement or the repair of the nest boxes within 2 months of receiving the nest box
action monitoring reports.
Timings Nest boxes should be installed within 2 months of clearing works commencing.
FAUNA MANAGEMENT PLAN | Summit Road, Pomona
30
Document Set ID: 22570982
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.