Original source · versioned page text
Approved Plan - OPW230084
Plans and drawings: the text below has words only, no drawings.
5. DISCUSSION
This FMP provides a consolidated management document to mitigate impacts and protect native
fauna during approved vegetation clearing works. It must be followed in conjunction with all other
approved plans, including the Rehabilitation Management Plan and the Bushfire Mitigation Report FM
5810-6.
Vegetation clearing shall only occur once all approvals have been granted and any necessary
environmental controls are in place. A FSC must be present for all vegetation clearing, mulching, and
grubbing works to mitigate adverse impacts and reduce disturbance to fauna.
The FSC, clearing contractors, and other on-site personnel must ensure works are undertaken in a
safe and professional manner with consideration for fauna management protocols at all times.
FAUNA MANAGEMENT PLAN | Summit Road, Pomona
31
Document Set ID: 22570982
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.