           5.1. Establishment and Maintenance Program

           Maintenance and monitoring works are to be undertaken on a regular basis. Table 3 below outlines
           the maintenance and monitoring schedule of the site and the required actions.


           Table 3. Establishment and maintenance program.

                 Works                        Year One                       Year Two                Year Three
            Watering               If insufficient rainfall - watering Monthly monitoring: take Monthly     monitoring:
                                   is to be undertaken 3 times in action if required            take action if required
                                   the 1st week; 2 times in the 2nd
                                   week after planting and once in
                                   the 3rd week after planting. On-
                                   going monitoring of soil
                                   moisture        depending        on
                                   weather conditions; take action
                                   if required
            Weed Control           Monthly                            Bimonthly                Quarterly
                                   Application expected to vary Application expected to Application expected
                                   according to season.         vary     according   to to vary according to
                                                                season.                 season.

            Mulching               Initially during planting, then if If required              Not required
                                   required

            Replacement            Assess in 6 weeks, 3 months Replacement required if Replacement required
            planting               and 6 months; Replacement survival is < 95%         if survival is < 95%
                                   required if survival is < 90%
            Additional             Assess in 6 months; only Required              if areas Not required
            planting               required in areas of insufficient insufficient        in
                                   establishment of canopy cover establishment of canopy
                                                                     cover
            Reporting              Undertake bi-annually; provide Undertake bi-annually; Undertake bi-annually;
                                   information to developer       provide information to provide information to
                                                                  developer              developer




           REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona                                               15


Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
Log in to download the original file

Approved Plan - OPW230084.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.