5.2. Corrective Actions
Table 4 below outlines the corrective actions to be taken if an issue arises.
Table 4. Corrective actions.
Issue Monitoring Indicator Corrective Action
Low water Monthly; Plant wilting, die back, Implement an appropriate watering regime until
availability increase if in low soil moisture levels sufficient rain occurs
drought
Weed Monthly Large weed infestation Assess cause - off site sources, lack of mulch,
infestation out breaks; weeds existing seed bank etc., Implement appropriate
setting seed action - immediately undertake weed control,
increase maintenance schedule until under
control
Low growth Quarterly Height & canopy cover Assess cause - time of year, water availability,
rate projections below set high non endemic competition, low soil
criteria for each year nutrients, etc., Implement appropriate action –
increase watering schedule, weed control,
fertilise, etc; consider alternative species
Erosion, soil Monthly; after Loss of soil; formation of Assess cause – insufficient root systems, no
instability high rainfall rills ground cover, excessive runoff, etc.; Implement
events appropriate action - increase density of plants
with mat forming root systems; direct seed with
endemic grass species; install weed matting /
mulch etc.
Loss of Quarterly Die off or loss of Replace lost species at minimum 6 weeks prior
species individuals to end of maintenance period; consider
alternative species
Mulching Monthly Excessive weed growth Re-mulch where required
REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona 16
Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.