Skip to the record
Accept no imitations.

Original source · versioned page text

Approved Plan - OPW230084

of 68

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
           7. RESPONSIBILITIES & REPORTING
           All works outlined within this document are the responsibility of the developer to assign an appropriate
           qualified bush regenerator, with a minimum of 5 years of experience in revegetation and regeneration,
           certificate in Land and Conservation or equivalent, until the end of the maintenance period.
           The quarterly monitoring and reports are to be undertaken by a suitably qualified bush regenerator
           with a minimum of 5 years of experience. Reports are to be submitted to the developer containing
           information on the maintenance, including watering, mulching, fertilising, weed control and other
           necessary actions / rectification works completed during the “On Maintenance” period.




           REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona                                           18


Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
Log in to download the original file

Approved Plan - OPW230084.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.