Original source · versioned page text
Approved Plan - OPW230084
Plans and drawings: the text below has words only, no drawings.
7. RESPONSIBILITIES & REPORTING
All works outlined within this document are the responsibility of the developer to assign an appropriate
qualified bush regenerator, with a minimum of 5 years of experience in revegetation and regeneration,
certificate in Land and Conservation or equivalent, until the end of the maintenance period.
The quarterly monitoring and reports are to be undertaken by a suitably qualified bush regenerator
with a minimum of 5 years of experience. Reports are to be submitted to the developer containing
information on the maintenance, including watering, mulching, fertilising, weed control and other
necessary actions / rectification works completed during the “On Maintenance” period.
REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona 18
Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.