Original source · versioned page text
Approved Plan - OPW230084
Plans and drawings: the text below has words only, no drawings.
6. PERFORMANCE CRITERIA
Year One
• Less than 10% weed and evidence of regular weed management
• Average tree height 1m with good health, vigour, and ground connection
• Less than 10% plant failure and evidence of supplementary planting
• Mulch to a minimum depth of 50-100mm in revegetation areas
• No rubbish present
Year Two
• Less than 5% weed and evidence of regular weed management
• Average tree height 1.8m with good health, vigour, and ground connection
• Less than 5% plant failure and evidence of supplementary planting
• Evidence of natural recruitment
• Mulch to a minimum depth of 100mm in revegetation area or adequate canopy cover to
suppress understorey weeds
• No rubbish present
Year Three
• Less than 5% weed and evidence of regular weed management
• Average tree height 3m with good health, vigour, and ground connection
• Less than 5% plant failure and evidence of supplementary planting
• The ground surface must not display any area devoid of vegetation coverage greater than
1.0 m² (within any 10.0 m² sample)
• Adequate canopy cover to suppress understorey weeds without additional mulch (except for
mulching to vegetation edge areas)
• No rubbish present
REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona 17
Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.