NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 13
iii. the proposed visitor carspace shall be a minimum of 5.4m x 3.0m and.
iv. The access aisle in the basement carparking area shall have a minimum width of 5.8m.
25. The proposed turning area at the end of the aisle that serves the proposed double carspaces shall be
line-marked with chevrons and have the words “No Parking” painted on the pavement. A sign shall also
be provided to indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.
26. The proposed visitor carspace shown on drawing number 61.04.52B dated 23 Aguust 2007 by Will
Franklin Design shall be dedicated as a visitor car space and shall be signposted “visitor parking” and
shall have similar wording painted onto the pavement to prevent misuse of this space.
27. To ensure that visitors to the site are aware of the on-site visitor parking facilities, a small sign shall be
erected on the front property boundary, adjacent to the driveway, to advise visitors to park on-site in the
designated visitor car park space.
28. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Frontage Works
29. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Douglas Street
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Grass shall be couch, free of weeds.
30. A new 1.5m wide concrete path shall be constructed along the Douglas Street frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant vegetation
or any underground services.
31. All paths shall be designed and constructed to ensure pedestrian safety using non-slip materials, to
produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act
1992 and Australian Standard 1428.1 Design for Access & Mobility.
32. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
Stormwater Drainage
33. All stormwater drainage shall be collected on site and discharged so there is no net increase in
stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
to Council’s existing drainage structures in Douglas Lane. Plans of the drainage design shall be prepared
by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development
Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank can be used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling/unit. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works approval and any overflow shall be directed to the stormwater drainage system.
35. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works.
The approved maintenance plan shall be incorporated in the Community Management Scheme for the
development and a copy of this shall be provided for Council’s records prior to commencement of the
approved Use.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.