Council archive · source document
Minor Change Existing Approval 132004 5744 13 [As Published] · 132004.5744.13
84. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a forward
direction.
85. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the complex and approved by Council’s
Environmental Health Section prior to issue of development permit for operational works.
The Plan shall include the following information: -
85.1 The types of waste that will be generated from the activities approved within the
development.
85.2 Estimated volumes or tonnage of recyclables within the generated waste stream
85.3 Estimated volumes or tonnage of waste generated from the activities.
85.4 Methods to be used for dealing with garden waste.
85.5 Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
85.6 Description of procedures involving disposing of refuse to bins; the storage of bins and
the collection of bins by the contractor and who is responsible for each transfer of the
waste.
85.7 A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and of prevention of storm
water contamination.
85.8 A description of types and volume of waste storage containers to be used.
85.9 The waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper
and cardboard, glass, aluminium and steel cans, waste oil, styrofoam boxes, etc, and
bin washing facilities.
85.10 A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
86. A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
be submitted for the demolition and construction phases of the development and approved
by Council’s Environmental Health Section prior to the issue of the development permit for
operational works. The Plan shall contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify *specify contractor and
(m³) proposed re-use contractor and landfill site
or on-site recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Page 11 of 17
Document Set ID: 23615315
Version: 3, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132004 5744 13 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.