               Erosion and Sediment Control
               71.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary. In this regard plans detailing the methods of
                      controlling erosion and sediment are required to be submitted to the Council for approval
                      prior to obtaining a Development Permit for Operational Works.
               General
               72.    Prior to works commencing contractors shall submit a Traffic Management Plan showing
                      measures to be put in place during construction for approval by Council’s Works Directorate.
               73.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works that will become Council infrastructure, which
                      shall be submitted in conjunction with an application for a Development Permit for
                      Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
                      cadastre layout is to be submitted in conjunction with any application for Operational Works.
               74.    Digital detailed design drawings and calculations shall be submitted with any application for
                      a Development Permit for Operational Works in respect of roadworks and stormwater
                      drainage works. To avoid conflict with underground pipes or services, all existing and
                      proposed services required by the development shall be shown on the plans.
               75.    To facilitate production of As Constructed drawings it is suggested that all design drawings
                      are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
                      the use of ADAC are available at www.adac.com.au).
               76.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council. Particular care shall be exercised when
                      working near the rising main in the road reserve to the north of the site.
               77.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.
               78.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
                      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
                      and type of all services and structures. All of which shall be submitted to Council for checking
                      and for Council’s records.
               79.    The data must fully detail levels for all engineering works including but not limited to drainage
                      structures, finished ground levels and pavement surface levels. The data shall be submitted
                      in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
                      ADAC are available at www.adac.com.au).
               80.    Approval of works shall not be granted until all As Constructed information has been supplied
                      and accepted by Council.
               Environmental Health
               81.    The developer must provide waste storage and disposal facilities in accordance with
                      Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
                      Industrial Premises”, including an external imperviously paved area correctly sized for all
                      refuse and recycling containers and suitably screened from public places and neighbouring
                      properties. A roofed wash down area is required with a cold-water tap, hose and drain outlet
                      connected to sewer.
               82.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
               83.    A clinical waste service provided by a licensed clinical waste contractor must be provided for
                      the activities.




                                                                                                       Page 10 of 17
Document Set ID: 23615315
Version: 3, Version Date: 05/03/2025

Used in these records

About this file

File size
212 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132004 5744 13 [As Published].pdf · 212 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.