ORDINARY MEETING AGENDA 20 AUGUST 2020
d) all weather surface, e.g. gravel, concrete or bitumen, etc.;
e) 6m wide by 8m deep turnaround bay near the northern end; and
f) established as an access easement that is granted in favour of the Queensland
Fire and Rescue Service and Noosa Shire Council.
Ecological
31. The Applicant is required to prepare a Vegetation Management Plan (VMP). The VMP
is to clearly identify the extent of all development works, and particularly trees to be
retained and removed. The VMP is to be submitted with a development application for
operational work. The VMP must be implemented prior to sealing of the plan of survey.
The VMP is to be prepared by a suitably qualified and experienced ecologist and address
the following:
a) provide arborists advice seeking to minimise the loss of trees in close proximity to
development works;
b) the fire-trail within proposed Lot 1 is to be constructed to minimize tree removal,
and must avoid impacts to eucalypts where possible;
c) a fauna spotter be on site during tree clearing works;
d) any necessary removal of any gums (eucalypts) are to be replaced at a ratio of 3:1
(i.e. replant 3 trees for every 1 removed). This compensatory planting is to be
provided in the western portion of proposed Lot 1 and beyond the fire trail (a
planting plan which identifies planting locations and species is to be prepared);
e) weed management is to be undertaken on the western portion of proposed Lot 1;
f) the natural regeneration of the western part of the site (i.e. outside the bushfire
management area) shall be allowed to occur;
g) any boundary fencing for proposed Lot 1 must be fauna friendly;
h) erosion control measures (standard best practice) to be implemented where
necessary for any earthworks;
i) installation of four nest boxes (e.g. 1 x glider, 1 x possum and 2 x parrot) is required
in trees within the western portion of the site to compensate for the lack of hollows
in the local landscape.
Community Management Statement
32. The community management statement for the proposed development must, at all times,
contain provisions requiring strict compliance by the owners and occupiers of the
proposed lots with the approved FEMP and the maximum building height requirements.
The community management statement must be submitted to the Council at the time of
sealing of the plan of survey.
Owners responsible for Body Corporate
33. The owners of the proposed lots, including successive landowners must, jointly and
severely, ensure that the requirements of these conditions to be carried out by the Body
Corporate or for which the Body Corporate is responsible, are complied with.
Water & Sewer Connections
34. An underground connection to reticulated water and sewerage must be provided to each
lot in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater).
Page 17 of 19