D194/2014 - Sealed Order
d. Suitable safety measures, including: traffic directional signage, warning signage
and speed limit/s within the site, to improve driver awareness of pedestrians and
enhance pedestrian safety.
e. Provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
14. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Frontage Works - Footpath
15. Frontage works must be provided for the development. The works must be
undertaken in accordance with a Development Permit for Operational Works and must
include in particular:
a. A two (2) metre wide concrete footpath within the road verge for the entire length
of the site's frontage to Rene Street In compliance with IPWEAQ standard
drawing SEQ R-065 Concrete Pathway Construction Details. The footpath must
match the levels the driveways to the site without step or trip hazard. Where
necessary existing driveway finish level should be adjusted to ensure compliance
grades for the footpath and driveway.
b. Replacement of any street trees affected by the frontage works.
Stormwater Drainage
16. Prior issue of building works approval for the new building on the eastern portion of the
site, an Operational Works approval for treatment of stormwater quality must be
obtained. The application for Operational Works Approval for stormwater must provide
for treatment of stormwater from the entire site.
17. The stormwater quality treatment system shall be designed and implemented generally
. in accordance with "Option 1" presented in the "Site Based Stormwater Management
Plan (4298-1.0) for 66 Rene Street" dated 9 October 2014 by STORMwater Pty Ltd.
18. An ongoing maintenance contract for the stormwater quality treatment devices must be
established and provided to Council prior to commencement of use of the new building
on the eastern portion of the site. The maintenance contract schedule must be
consistent with the manufacturer's requirements to achieve an ongoing pollutant
reduction efficiency of 80% reduction in Total Suspended solids, 60% reduction in
Total Phosphorous and 45% reduction in Total Nitrogen in runoff from the site
compared to an untreated situation.
19. All copies of stormwater maintenance documentation must be kept for a period of 5
years and made available to Council officers on request to demonstrate compliance
with the conditions of this approval.
Earthworks
20. Any earthworks required on site shall be carried out in accordance with Council's
Planning Scheme Policy PSP5 - Engineering Design Standards - Roads, Drainage
and Earthworks and must be undertaken in accordance with a Development Permit for
Operational Works.
21. Earthworks carried out on site shall not affect the structural integrity of any of the
adjoining properties, existing fences or structures that border the development site.
Fences that are affected shall be replaced prior to the Building Certifier issuing the
Certificate of Classification. In this regard any fences to be replaced shall be clearly
shown on the plans submitted for Operational Works approval.