Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

24BRW0157 OWMP Final

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2.6.         Refuse Transfer
Staff / cleaners will transfer all refuse generated from the various areas within the building or from refuse
collected from buses to the refuse enclosure for final disposal.
The collecting contractor will collect all bins directly from the refuse enclosure and manoeuvre a short
distance to the RCV lifting mechanism, and return to the enclosure after service.
The refuse transfer path has been designed to allow for:

   Refuse Transfer Path Design Requirements
   The bins to be transferred via hard stand pathway.

   Allows bins to be easily manoeuvred.

   Does not impede traffic flow.

   Does not extend through any habitable parts of a building or food premise

   Does not have any lips, stairs or steps for bins to be manoeuvred easily.




Site: 5 – 13 Production Street, Noosaville                                                                      15
Reference: 24BRW0157
Log in to download the original file

24BRW0157 OWMP Final.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.