Original source · versioned page text
24BRW0157 OWMP Final
2.6. Refuse Transfer Staff / cleaners will transfer all refuse generated from the various areas within the building or from refuse collected from buses to the refuse enclosure for final disposal. The collecting contractor will collect all bins directly from the refuse enclosure and manoeuvre a short distance to the RCV lifting mechanism, and return to the enclosure after service. The refuse transfer path has been designed to allow for: Refuse Transfer Path Design Requirements The bins to be transferred via hard stand pathway. Allows bins to be easily manoeuvred. Does not impede traffic flow. Does not extend through any habitable parts of a building or food premise Does not have any lips, stairs or steps for bins to be manoeuvred easily. Site: 5 – 13 Production Street, Noosaville 15 Reference: 24BRW0157
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.