Original source · versioned page text
24BRW0157 OWMP Final
Table 2.9 outlines the refuse storage area design criteria addressed in order to minimise odours, deter vermin, protect surrounding areas, and make it a user-friendly and safe area. Table 2.9: Refuse Storage Area Design Requirements Positioning Considerations Positioned in immediate proximity of the designated loading point Is in a purpose-built storage area which is designed to be unattractive to vermin and used solely for the storage of refuse leaving the site or specifically designed for service vehicle use only. Not located adjacent to or within any habitable portion of a building or place used in connection with food preparation (including food storage). Is positioned away from entrances to shops or residential premises Is over 5m from any door, window or fresh air intake within the development or any adjoining site. Visual Amenity Considerations Is enclosed on all sides except for the access points to ensure bins are not visible from a public place, neighbouring properties, passing vehicles or pedestrian traffic external to the site. Is designed to minimise their visual impact on the surrounding areas. Functional Design Considerations Is of sufficient size to accommodate the bins with sufficient clearance around the combined bin area Access openings wide enough to allow for the easy removal of the largest container to be stored. Permits unobstructed access for removal of the containers to the service point. The height of the bin storage area allows for waste bins to be opened and closed. Does not have any steps or lips. Adequate artificial lighting. Bin Washing and Room Cleaning Considerations A hose cock fitted with backflow prevention device provided inside the enclosure or immediately adjoining for cleaning bins and the enclosures. The walls, ceilings, floors and equipment are to be designed and constructed of impervious material with a smooth finish to allow for easy cleaning. The floors to be bunded and graded to fall to a drainage point. Drainage points connected to sewer in accordance with trade waste requirements. Roofed and designed to prevent entry by rainwater. Site: 5 – 13 Production Street, Noosaville 14 Reference: 24BRW0157
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.