Skip to the record
Search everything, all in one place.

Original source · versioned page text

24BRW0157 OWMP Final

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

    1.4.         Development Summary
    The proposed transport depot consists of a single building, divided into workshop and ancillary office with
    external at grade staff car and bike parking. Additionally, fleet parking and charging areas to support a fleet of
    32 fully electric buses.
    Table 1.2 below provides a summary of the floor areas within the development.
    Table 1.2: Development Summary
     Description                                                                         Measure
     Office                                                                              183.1m2 GFA
     Workshop                                                                            274.2m2 GFA
•    Total                                                                            − 457.3m2 GFA




    Site: 5 – 13 Production Street, Noosaville                                                                    6
    Reference: 24BRW0157
Log in to download the original file

24BRW0157 OWMP Final.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.