Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

24BRW0157 OWMP Final

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2.           Regulatory Refuse Management
             Requirements
This section provides the detailed refuse calculations and describes the arrangements for the collection,
storage, transfer and disposal of refuse within the development as deemed to satisfy council’s current
assessment benchmarks. This includes associated bin quantities, storage capacities, equipment details,
collection frequencies and site access details.

2.1.            Regulatory and Governance Considerations

2.1.1.       Council’s Refuse Planning Scheme
This plan has been prepared to align with Noosa Council’s assessable outcomes of 9.4.10 Waste
Management Code and SC6.10 – PSP9 Waste Management of the Noosa Plan 2020 as mandated by council’s
conditions of approval.
Specific design details addressed to achieve compliance with Noosa Council PSP9 Waste Management
requirements is located in Appendix A.
Table 2.1 details the conditions of approval relating to waste.
Table 2.1: Conditions of Approval
 Condition
 Waste Management
 17.         A waste storage area must be designed and maintained in accordance with Planning Scheme Policy PSP9 Waste
             Management and the Noosa Plan’s Waste Management Code.
             The waste storage area must be:
                       a. imperviously paved and correctly sized for all refuse and recycling containers;
                       b. bunded and graded so that wastewater and bin leakage drain to the sewer;
                       c. provided with a conveniently located hosecock and backflow prevention device, connected to a water
                       supply to service the area; and
                       d. roofed or otherwise covered.
 18.         A Waste Management Plan must be prepared that details the type and quantity of waste material that is likely to be
             generated by the development; where and how the waste will be stored, disposed of and procedures for handling the
             waste. The Waste Management Plan must be submitted and approved by Council prior to the issue of a Development
             Permit for Operational Works.




Site: 5 – 13 Production Street, Noosaville                                                                                     7
Reference: 24BRW0157
Log in to download the original file

24BRW0157 OWMP Final.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.