Information Request OPW25 0042 [As Published] · OPW25/0042
Officer: Daniel Epps
Direct Telephone: 07 53296223
Our Reference: OPW25/0042
Your Reference: 22070
16 April 2025
Calile Malouf Investments P/L TTE
C/- Project Urban
PO Box 6380
MAROOCHYDORE QLD 4558
[email protected]
Dear Sir/Madam,
Information Request
Planning Act 2016
I refer to your application and advise that Council requires further information to satisfactorily
assess the proposal.
1. APPLICATION DETAILS
Application No. OPW25/0042
Proposal: Earthworks & Stormwater
Street Address: 7 Serenity Cl Noosa Heads Qld 4567
Real Property Description: Lot 11 SP 195871, Lot 10 SP 335472
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. INFORMATION REQUIRED
The information requested is set out below:
Item – Stormwater Management
Council has identified the following items relating to stormwater management, compliance with
Condition 46 of the higher-order approval, and design of the overland flow path through the
development.
Information Required
1. Clarify how external catchment areas contributing to the sag in Serenity Close have
been identified.
It is noted that 6 Serenity Close (‘Elandra’) was assumed to drain mainly to Serenity
Close and then through the site in the previous submission, but now has been excluded
from the catchment areas.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 3
Document Set ID: 23692869
Version: 3, Version Date: 16/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Provide a table identifying each property fronting Serenity Close for the section of
Serenity Close which grades to the sag and provide an explanation of how the direction
of drainage for each property has been determined (in particular, where it is assumed to
not fully drain to Serenity Close).
2. Clarify what design blockage values have been adopted for the stormwater inlets in the
design case in the overland flow assessment.
3. Clarify what climate change assumptions have bene adopted in the overland flow
assessment.
It is suggested that SPP2-4.5 and a planning horizon of 2100 be adopted consistent with
the current methodology of ARR.
4. It is noted that 1% AEP (2100) immunity for the staff facilities building is achieved by the
use of a levee (block wall).
It would be preferable if the levee was only used to achieve freeboard rather than 1%
AEP (2100) immunity.
5. Provide further contours or sections in the location of RIP 3B and RIP 5 to demonstrate
that surface levels or an overland flow path (which may be informal) will allow and
surcharge flows from these devices to flow to a lawful point of discharge without
impacting any of the development buildings or facilities.
6. It is noted that a gabion rock wall is specified as the method of retaining along the edge
of the overland flow swale in places. Given the ability of water to seep into this type of
retaining (large voids), it is unclear if this method of retaining is suitable for the edge of
a drainage channel and if a more suitable method is available that provides better long-
term performance of the channel and adjoining areas.
Issue – Overland Flow Channel
The design of the Overland Flow Channel includes roughness assumptions consistent with
mown grass or rock at a maximum batter of 1:2. Council has concerns with the ability to
provide long-term stabilisation for a grass or rock 1:2 batter.
Information Required
7. Provide additional detail demonstrating how long-term stabilisation will be provided to
the batters of the Overland Flow Channel. The additional detail must be prepared by a
suitably qualified person (RPEQ) and include treatment options consistent with the
current hydraulic design assumptions of the Overland Flow Channel (i.e., turf or rock).
Where long-term stabilisation of the proposed 1:2 turfed/rocked batter isn’t achievable,
provide a revised set of drawings amending the Overland Flow Channel to include a
reduced batter (i.e., a 1:3 vegetated batter).
Issue – Extent of Vegetation in Overland Flow Channel
The higher order development plans suggest that the trapezoidal channel will include
landscaping (beyond turf) in the Overland Flow Channel. This is Council’s preferred outcome.
However, the inclusion of vegetation within this channel is inconsistent with the current
hydraulic design assumptions and could lead to flow breaking out of the channel and cause
flooding.
Information Required
8. Confirm the Overland Flow Channel will be vegetated to achieve a natural channel
design and meet the required hydraulic design assumptions.
Page 2 of 3
Document Set ID: 23692869
Version: 3, Version Date: 16/04/2025
Page 3
Item – Construction Traffic
A Traffic Impact Assessment has not been provided as part of the application material.
Council recognise that the haulage operations are likely to cause impacts to the local road
network and associated road infrastructure.
Information Required
9. Provide a Traffic Impact Assessment (TIA) to assess the impacts of construction traffic
associated with the prescribed works. The TIA must be prepared by a suitably qualified
person (RPEQ) with Traffic Management Design qualification, in accordance with the
Department of Transport and Main Roads Guidelines, and must include, but not be
limited to:
a. a Road Safety Audit;
b. Pavement Impact Assessment;
c. a Traffic Management Plan – the Traffic Management Plan must be developed in
accordance with the Queensland Manual of Uniform Traffic Control Devices
(MUTCD) and the Queensland Guide to Temporary Traffic Management (GTTM);
d. proposed haulage route – including the scheduled duration of excavation/haulage
works, number of haulage vehicles exiting the site per hour, and the type of
haulage vehicle (i.e., truck or truck and dog); and
e. the receiving location(s) of the exported spoil.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 22 July 2025. Email your response to
[email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Daniel Epps
Senior Development Engineer
Page 3 of 3
Document Set ID: 23692869
Version: 3, Version Date: 16/04/2025
Used in these records
Information Request OPW25 0042 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 105 KB (small file)
- File type
No other editions are linked here.