Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Information Request OPW25 0042 [As Published] · OPW25/0042

of 3

Text shows just the words. Original shows the document exactly as it was published.

                 Item – Construction Traffic
                 A Traffic Impact Assessment has not been provided as part of the application material.
                 Council recognise that the haulage operations are likely to cause impacts to the local road
                 network and associated road infrastructure.
                 Information Required
                 9.     Provide a Traffic Impact Assessment (TIA) to assess the impacts of construction traffic
                        associated with the prescribed works. The TIA must be prepared by a suitably qualified
                        person (RPEQ) with Traffic Management Design qualification, in accordance with the
                        Department of Transport and Main Roads Guidelines, and must include, but not be
                        limited to:
                        a.      a Road Safety Audit;
                        b.      Pavement Impact Assessment;
                        c.      a Traffic Management Plan – the Traffic Management Plan must be developed in
                                accordance with the Queensland Manual of Uniform Traffic Control Devices
                                (MUTCD) and the Queensland Guide to Temporary Traffic Management (GTTM);
                        d.      proposed haulage route – including the scheduled duration of excavation/haulage
                                works, number of haulage vehicles exiting the site per hour, and the type of
                                haulage vehicle (i.e., truck or truck and dog); and
                        e.      the receiving location(s) of the exported spoil.
                 3.     DUE DATE FOR RESPONSE TO INFORMATION REQUEST

                 The due date for providing the requested information is 22 July 2025. Email your response to
                 [email protected]. Please advise Council of your response to this information request
                 in accordance with section 13 of the Development Assessment Rules.
                 If you do not provide a response before the due date, it will be taken as if you have decided
                 not to respond to the information request and Council will continue with the assessment of
                 your application.
                 4.     OTHER DETAILS

                 You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
                 Services” page can be accessed via "Quick Links" on the left hand side of the screen.
                 Should you have any further queries in relation to the above, please do not hesitate to contact
                 me on the number above.
                 Yours faithfully,




                 Daniel Epps
                 Senior Development Engineer




                                                                                                        Page 3 of 3
Document Set ID: 23692869
Version: 3, Version Date: 16/04/2025

Used in these records

About this file

File size
105 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW25 0042 [As Published].pdf · 105 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.