NOOSA COUNCIL IDAS Development Application Decision Notice                        06/0932 16 May 2006                          3 of 7




                                          Noosa Council Conditions
                                          INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


This Decision Notice is issued subject to and conditional upon the relevant Approved Development Permit having been
granted to the applicant.

Special Conditions

1.     Proposed sewer is located within a layer of peat and as such requires additional bedding and support to guarantee
       integrity of the system. Method of sewer support must be submitted and approved by Water & Sewerage Capital
       Works Manager prior to commencement of works on-site.

2.     Appropriate silt and sediment control devices to be in place prior to commencement of works.

3.     Dewatering - Council will allow discharge of the dewatering process to existing Council sewers which discharge to
       Pump Station NV2 in Mill Street providing rate of discharge does not impose any detrimental effects on the
       sewerage pump station. Council’s Sewerage Pump Station Foreman, Martin Pratt, Ph. 5440 9136 shall be
       contacted to arrange appropriate monitoring of process.

       Should rate of discharge be unsuitable, the dewatering process is to cease immediately and alternative
       arrangements made for treatment and disposal of water produced.

4.     Acid sulphate soils management plan to be approved prior to commencement of works.


1.     A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of this Decision
       Notice, and prior to commencement of works.

2.     The names of any proposed contractors for works are to be submitted in writing, together with copies of current Public
       Liability and Workers Compensation Insurances together with certificates of currency for those policies, for consideration
       by the Assessment Manager seven (7) days prior to pre-start meetings and commencement of works.
       A separate letter will then be issued approving the contractor (or otherwise) for the works. No other contractor or
       subcontractor shall be engaged to carry out the works or any part of the works without the written approval of the
       Assessment Manager.

3.     Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A pre-start
       meeting shall be arranged prior to commencement of works by contacting Council’s Water & Sewerage Inspector, Mr
       Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start meetings, inspections and testing etc.
       between the hours of 6:30am to 4:00pm, Monday to Friday. Inspector will not be available outside these hours unless
       prior approval is obtained from the Water & Sewerage Capital Works Manager with any costs incurred by Council outside
       the hours nominated above, met by the Contractor/Developer. These costs will be in addition to normal inspection fees.

4.     Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations
       exist with Council's standards, Council standards shall apply.

5.     It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable care during the
       construction of the engineering works to ensure that Council property or facilities (such as underground drainage, water
       supply and sewerage) are protected against any damage or interference whatsoever.
       If any Council property or facilities should be damaged by the applicant or any of its consultants or contractors through
       any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the applicant and/or its
       contractors shall forthwith notify the Assessment Manager and shall forthwith rectify the damage to that property or
       facility at its cost to the satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance of
       the works on-maintenance. Alternatively, the applicant may request the Council to carry out the rectification work at the
       applicant's cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan and/or
       acceptance of the works 'on maintenance' provided that in the case of emergency, the Council shall be entitled to rectify
       such damage at the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of
       the work 'on maintenance'.

6.     The Contractor shall make all necessary arrangements for supply of water required for construction works. The use of
       hydrant standpipes on Council mains will NOT be permitted. Contractors should contact Council’s Water Section on
       phone 5449 5254 to obtain an application form for issue of a key to access Council’s water tanker filling stations.
       Conditions of access and location of filling stations are detailed on the application form.




AB c:\users\abecker\downloads\ecm_9956525_v1_decision notice.doc

Used in these records

About this file

File size
337 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice.pdf · 337 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.