50. Prior to requesting an Off Maintenance inspection, the developer must provide a written
request for the Off Maintenance inspection.
51. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements; or
b. submitted certification falsely states works comply with approval requirements.
52. A final inspection and approval of the completed reinstatement works by Council’s Inspector
is required. Please contact Council on 5329 6500 to arrange for the inspection.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
BBNE01676- 1 Overland Flow Assessment 9 June 2025
0001-REP-001
Prepared by Engeny
22BRT0122 N.A. Traffic Impact Assessment (TIA) Prepared by N.A.
Colliers
N.A. N.A. Traffic Guidance Scheme Prepared by AVADA N.A.
Traffic
25040286 0 Traffic Management Plan Prepared by AVADA 28/04/2025
Traffic
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. As this driveway is a private structure, the owner bears full responsibly for the standard of its
construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed in accordance with standard drawings RS-051.
2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
4. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Page 12 of 16
Document Set ID: 24143123
Version: 4, Version Date: 26/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 202 KB (small file)
- File type
No other editions are linked here.