                        2.    Council has decided to refuse the representations made to Condition 11c. The
                              proposed haulage route is likely to experience degradation due to the geometry of the
                              roads (i.e., roundabouts, tight turns, extent of road furniture, up-and-down grades, etc.).
                              Council acknowledges the haulage route west of the Webya Road/Noosa Drive
                              currently experiences substantial traffic volumes; however, these volumes are unlikely
                              to consist of heavy vehicles under load. Council believes the condition is reasonable
                              and relevant and is in the best interest of both parties to protect themselves during
                              haulage works.
                        3.    Council has decided to refuse the representations made to Condition 13. The bond is
                              imposed to secure the performance of any municipal asset(s) and provides a financial
                              incentive for the applicant to undertake the necessary maintenance and/or rectification
                              works on the asset during the maintenance period and before asset handover to
                              Council. Council will not accept an asset as ‘on maintenance’ without a municipal works
                              bond (referred to as a ‘Maintenance Bond’).
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.               Rev.       Plan/Document Name                             Date

                        A6769-24-EW01          A          EARTHWORKS LAYOUT – SHEET 1                    27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW02          A          EARTHWORKS LAYOUT – SHEET 2                    27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW03          A          EARTHWORKS SECTIONS SHEET 1                    27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW04          A          EARTHWORKS SECTIONS SHEET 2                    27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW05          A          EARTHWORKS SECTIONS SHEET 3                    27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW06          A          EARTHWORKS DETAILS – SHEET 1                   27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-EW07          A          EARTHWORKS DETAILS – SHEET 2                   27 February
                                                                                                         2025
                                                          Prepared by ALTA

                        A6769-24-D01           B          DRAINAGE LAYOUT                                12   March
                                                                                                         2025
                                                          Prepared by ALTA




                                                                                                          Page 2 of 16
Document Set ID: 24143123
Version: 4, Version Date: 26/09/2025

Used in these records

About this file

File size
202 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published).pdf · 202 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.